IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0704 # 12 Y:2016 12 2016 OPTIMIZE PLANT POWER FACTOR $918 $3,100 Implemented
AM0704 # 13 Y:2016 13 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $320 $0 Not Implemented
OR0668 # 01 Y:2016 01 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $64,602 $27,375 Not Implemented
OR0668 # 02 Y:2016 02 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,966 $1,900 Implemented
OR0668 # 03 Y:2016 03 2016 REDUCE FLUID FLOW RATES $9,090 $13,345 Implemented
OR0668 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $20,693 $21,375 Not Implemented
OR0668 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,529 $42,750 Not Implemented
OR0668 # 06 Y:2016 06 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $20,233 $54,456 Not Implemented
OR0668 # 07 Y:2016 07 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $131,042 $638,642 Not Implemented
OR0668 # 08 Y:2016 08 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,925 $70,000 Not Implemented
LE0413 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,124 $500 Implemented
LE0413 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,494 $725 Implemented
LE0413 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $3,060 $1,800 Not Implemented
LE0413 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $973 $1,000 Implemented
LE0413 # 05 Y:2016 05 2016 INSTALL TIMERS AND/OR THERMOSTATS $482 $590 Implemented
LE0413 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,404 $15,000 Implemented
LE0413 # 07 Y:2016 07 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,462 $25,000 Implemented
LE0413 # 08 Y:2016 08 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,559 $14,000 Not Implemented
SD0525 # 01 Y:2016 01 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,264 $750 Not Implemented
SD0525 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,754 $16,450 Not Implemented
SD0525 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,617 $7,417 Not Implemented
SD0525 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,051 $2,510 Not Implemented
SD0525 # 05 Y:2016 05 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,666 $7,316 Not Implemented
SD0525 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,406 $1,200 Not Implemented
SD0525 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,715 $200 Not Implemented