Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
492
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0074 # 04 Y:2016 | 04 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,398 | $951 | Implemented |
IP0074 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,366 | $308 | Implemented |
IP0074 # 06 Y:2016 | 06 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $473 | $101 | Implemented |
IP0074 # 07 Y:2016 | 07 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $20,689 | $4,600 | Not Implemented |
IP0074 # 08 Y:2016 | 08 | 2016 | APPLY FOR INVESTMENT INCENTIVES | $6,707 | $5,000 | Implemented |
IP0074 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,616 | $56,725 | Implemented |
IP0074 # 10 Y:2016 | 10 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $147,202 | $313,184 | Not Implemented |
IP0031 # 01 Y:2014 | 01 | 2014 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $5,065,497 | $375,000 | Not Implemented |
IP0031 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,715 | $14,486 | Implemented |
IP0031 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,679 | $59,914 | Implemented |
IP0031 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,588 | $22,450 | Implemented |
IP0031 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,661,000 | $17,500,000 | Not Implemented |
IP0010 # 01 Y:2013 | 01 | 2013 | APPLY FOR INVESTMENT INCENTIVES | $4,545 | $0 | Implemented |
IP0010 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,822 | $0 | Implemented |
IP0010 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $446 | $0 | Implemented |
IP0010 # 04 Y:2013 | 04 | 2013 | INSULATE BARE EQUIPMENT | $17,755 | $1,700 | Not Implemented |
IP0010 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $1,962 | $107 | Implemented |
IP0010 # 06 Y:2013 | 06 | 2013 | INSULATE BARE EQUIPMENT | $1,488 | $430 | Not Implemented |
IP0010 # 07 Y:2013 | 07 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $571 | $221 | Implemented |
IP0010 # 08 Y:2013 | 08 | 2013 | INSULATE BARE EQUIPMENT | $103 | $70 | Not Implemented |
IP0010 # 09 Y:2013 | 09 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,108 | $1,795 | Implemented |
IP0010 # 10 Y:2013 | 10 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,207 | $2,916 | Not Implemented |
IP0010 # 11 Y:2013 | 11 | 2013 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $18,512 | $51,858 | Not Implemented |
IP0010 # 12 Y:2013 | 12 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,469 | $15,876 | Implemented |
IP0010 # 13 Y:2013 | 13 | 2013 | OPTIMIZE PLANT POWER FACTOR | $2,850 | $8,526 | Implemented |