Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
208
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0033 # 10 Y:1985 | 10 | 1985 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $4,126 | $1,770 | Not Implemented |
ST0033 # 11 Y:1985 | 11 | 1985 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $4,383 | $87 | Not Implemented |
ST0033 # 12 Y:1985 | 12 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $384 | $0 | Implemented |
ST0033 # 13 Y:1985 | 13 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $39,416 | $45,000 | Not Implemented |
ST0026 # 01 Y:1985 | 01 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $292 | $60 | Not Implemented |
ST0026 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,867 | $40 | Not Implemented |
ST0026 # 03 Y:1985 | 03 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $607 | $0 | Not Implemented |
ST0026 # 04 Y:1985 | 04 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $706 | $1,700 | Not Implemented |
ST0026 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,188 | $16,200 | Not Implemented |
ST0026 # 06 Y:1985 | 06 | 1985 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $6,181 | $0 | Not Implemented |
ST0026 # 07 Y:1985 | 07 | 1985 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,096 | $400 | Not Implemented |
ST0026 # 08 Y:1985 | 08 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $712 | $537 | Not Implemented |
ST0026 # 09 Y:1985 | 09 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,391 | $682 | Not Implemented |
ST0026 # 10 Y:1985 | 10 | 1985 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $155 | $450 | Not Implemented |
ST0018 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,967 | $2,258 | Not Implemented |
ST0018 # 02 Y:1985 | 02 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $679 | $0 | Implemented |
ST0018 # 03 Y:1985 | 03 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $533 | $750 | Not Implemented |
ST0018 # 04 Y:1985 | 04 | 1985 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $200 | $100 | Not Implemented |
ST0018 # 05 Y:1985 | 05 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,502 | $453 | Implemented |
ST0018 # 06 Y:1985 | 06 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,390 | $1,900 | Implemented |
ST0018 # 07 Y:1985 | 07 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,356 | $128 | Implemented |
ST0018 # 08 Y:1985 | 08 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $2,670 | $1,350 | Not Implemented |
ST0018 # 09 Y:1985 | 09 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,038 | $537 | Implemented |
ST0018 # 10 Y:1985 | 10 | 1985 | INSULATE BARE EQUIPMENT | $599 | $1,263 | Implemented |
ST0018 # 11 Y:1985 | 11 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $502 | $100 | Not Implemented |