IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,353

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0873 # 06 Y:2014 06 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $102,361 $450,000 Implemented
OK0873 # 07 Y:2014 07 2014 COVER OPEN TANKS $9,771 $0 Implemented
OK0873 # 08 Y:2014 08 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,004 $63,370 Not Implemented
OK0873 # 09 Y:2014 09 2014 OPTIMIZE PLANT POWER FACTOR $9,509 $11,638 Not Implemented
CO0681 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,480 $13,140 Not Implemented
CO0681 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $3,470 $900 Not Implemented
CO0681 # 03 Y:2014 03 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $175,400 $229,810 Implemented
CO0681 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,610 $8,490 Not Implemented
BS0026 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $339 $120 Implemented
BS0026 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $478 $15 Implemented
BS0026 # 03 Y:2013 03 2013 REUSE HIGH FERROUS METAL DUST AS RAW MATERIAL $1,699 $1,382 Not Implemented
BS0026 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,850 $752 Implemented
IA0514 # 01 Y:2014 01 2014 DIRECT WARMEST AIR TO COMBUSTION INTAKE $18,117 $82,200 Not Implemented
IA0514 # 02 Y:2014 02 2014 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,046 $55,230 Not Implemented
IA0514 # 03 Y:2014 03 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,061 $1,012 Not Implemented
IA0514 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,311 $140 Implemented
IA0514 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $665 $35 Not Implemented
IA0514 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $584 $687 Implemented
IA0514 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $4,335 $2,887 Not Implemented
IA0514 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $3,150 Not Implemented
MA0720 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,659 $200 Implemented
MA0720 # 02 Y:2013 02 2013 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,748 $1,000 Implemented
MA0720 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $10,121 $12,390 Implemented
MA0720 # 04 Y:2013 04 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,238 $10,000 Implemented
MA0720 # 05 Y:2013 05 2013 REDUCE VENTILATION AIR $7,186 $2,510 Not Implemented