Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
266
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0290 # 04 Y:2002 | 04 | 2002 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $18,405 | $33,700 | Not Implemented |
UF0290 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,807 | $0 | Not Implemented |
UF0290 # 06 Y:2002 | 06 | 2002 | USE OPTIMUM TEMPERATURE | $234,181 | $2,080 | Not Implemented |
UF0290 # 07 Y:2002 | 07 | 2002 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $3,259 | $1,633 | Not Implemented |
UF0290 # 08 Y:2002 | 08 | 2002 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,947 | $2,300 | Not Implemented |
UF0290 # 09 Y:2002 | 09 | 2002 | USE TANKS WITH A CONICAL BOTTOM OUTLET SECTION TO REDUCE WASTE ASSOCIATED WITH THE INTERFACE OF TWO LIQUIDS | $17,094 | $0 | Not Implemented |
UF0290 # 10 Y:2002 | 10 | 2002 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $174,200 | $0 | Not Implemented |
UF0290 # 11 Y:2002 | 11 | 2002 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $138,643 | $29,000 | Not Implemented |
MI0026 # 01 Y:2002 | 01 | 2002 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $26,325 | $45,000 | Not Implemented |
MI0026 # 02 Y:2002 | 02 | 2002 | CONDENSE OPERATION INTO ONE BUILDING | $23,625 | $714 | Implemented |
MI0026 # 03 Y:2002 | 03 | 2002 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $16,250 | $60 | Implemented |
MI0026 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,497 | $60 | Implemented |
MI0026 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $160 | $2 | Implemented |
MI0017 # 01 Y:2001 | 01 | 2001 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $91,260 | $30 | Implemented |
MI0017 # 02 Y:2001 | 02 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $60,831 | $6,664 | Not Implemented |
MI0017 # 03 Y:2001 | 03 | 2001 | ELIMINATE/REDUCE AN OPERATION | $6,170 | $120 | Implemented |
MI0017 # 04 Y:2001 | 04 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $20,783 | $13 | Implemented |
MI0017 # 05 Y:2001 | 05 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,778 | $520 | Implemented |
MI0017 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,964 | $520 | Implemented |
MI0017 # 07 Y:2001 | 07 | 2001 | EXPAND OPERATIONS INTO UNUSED SPACE | $81,743 | $42,000 | Not Implemented |
MI0016 # 01 Y:2001 | 01 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $7,181 | $3,300 | Implemented |
MI0016 # 02 Y:2001 | 02 | 2001 | ADJUST BURNERS FOR EFFICIENT OPERATION | $70,200 | $187 | Implemented |
MI0016 # 03 Y:2001 | 03 | 2001 | METER WASTE WATER | $8,529 | $3,650 | Not Implemented |
MI0016 # 04 Y:2001 | 04 | 2001 | CONVERT COMBUSTION EQUIPMENT TO BURN OIL | $21,440 | $10,399 | Not Implemented |
MI0016 # 05 Y:2001 | 05 | 2001 | MINIMIZE WATER USAGE | $6,397 | $1,899 | Not Implemented |