IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

494

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0193 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,099 $12,877 Not Implemented
UM0193 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,550 $3,000 Implemented
UM0193 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $675 Implemented
UM0193 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,365 $1,000 Implemented
UM0193 # 05 Y:2001 05 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $487 $1,000 Not Implemented
UM0193 # 06 Y:2001 06 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $341 $200 Implemented
UM0193 # 07 Y:2001 07 2001 USE RADIANT HEATER FOR SPOT HEATING $942 $4,500 Not Implemented
UM0193 # 08 Y:2001 08 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,160 $2,060 Not Implemented
UM0193 # 09 Y:2001 09 2001 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $9,870 $11,000 Not Implemented
UM0193 # 10 Y:2001 10 2001 REDESIGN PROCESS $40,150 $2,500 Implemented
UM0193 # 11 Y:2001 11 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $27,400 $1,000 Implemented
UM0193 # 12 Y:2001 12 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $26,010 $1,650 Not Implemented
UM0193 # 13 Y:2001 13 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $4,000 $4,200 Not Implemented
UM0189 # 07 Y:2001 07 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,250 $1,950 Not Implemented
UM0189 # 01 Y:2001 01 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,060 $1,400 Not Implemented
UM0189 # 02 Y:2001 02 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,362 $1,500 Not Implemented
UM0189 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $750 Not Implemented
UM0189 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,845 $1,284 Not Implemented
UM0189 # 05 Y:2001 05 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,900 $8,250 Not Implemented
UM0189 # 06 Y:2001 06 2001 RECOVER AND REUSE COOLING WATER $12,000 $4,400 Not Implemented
UM0182 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $375 Implemented
UM0182 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $361 $1,000 Not Implemented
UM0182 # 03 Y:2001 03 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $57,900 $28,900 Implemented
UM0182 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $43,000 $100,000 Not Implemented
UM0181 # 01 Y:2001 01 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $300 $300 Not Implemented