Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
259
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2408 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,749 | $39,000 | n/a |
UL2408 # 01 Y:2024 | 01 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $77,905 | $42,617 | n/a |
UL2408 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $319,482 | $2,990,386 | n/a |
UL2307 # 08 Y:2023 | 08 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $46,192 | $39,000 | Not Implemented |
UL2307 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $38,855 | $480,889 | Not Implemented |
UL2307 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,654 | $33,973 | Implemented |
UL2307 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,100 | $2,693 | Implemented |
UL2307 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $38,660 | $22,666 | Not Implemented |
UL2307 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,834 | $0 | Not Implemented |
UL2307 # 07 Y:2023 | 07 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $36,790 | $34,740 | Implemented |
UL2307 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,752 | $14,626 | Not Implemented |
TT0296 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,069 | $270 | Not Implemented |
TT0296 # 07 Y:2023 | 07 | 2023 | OPTIMIZE PLANT POWER FACTOR | $41,037 | $32,500 | Not Implemented |
TT0296 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $66,640 | $2,000 | Not Implemented |
TT0296 # 03 Y:2023 | 03 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $200,000 | $10,000 | Not Implemented |
TT0296 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $22,207 | $1,640 | Implemented |
TT0296 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,264 | $1,920 | Implemented |
TT0296 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $81,000 | $60,000 | Implemented |
TT0296 # 10 Y:2023 | 10 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $203,680 | $300,000 | Not Implemented |
TT0296 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,078 | $4,500 | Not Implemented |
TT0296 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,690 | $8,100 | Implemented |
TT0296 # 11 Y:2023 | 11 | 2023 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $2,853 | $7,500 | Not Implemented |
TT0265 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,587 | $3,967 | Implemented |
TT0265 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,704 | $9,000 | Not Implemented |
TT0265 # 01 Y:2022 | 01 | 2022 | INSULATE BARE EQUIPMENT | $12,477 | $2,065 | Not Implemented |