Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
119
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0256 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $43,875 | $401,481 | n/a |
UU0256 # 03 Y:2024 | 03 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,048 | $11,730 | n/a |
UU0256 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $14,319 | $31,625 | n/a |
UU0256 # 04 Y:2024 | 04 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $5,024 | $7,960 | n/a |
UU0216 # 05 Y:2023 | 05 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $5,644 | $500 | Not Implemented |
UU0216 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $40,810 | $55,030 | Not Implemented |
UU0216 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $33,351 | $454,189 | Not Implemented |
UU0216 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $28,144 | $4,000 | Not Implemented |
UU0216 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,031 | $2,025 | Not Implemented |
UU0216 # 04 Y:2023 | 04 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,370 | $31,280 | Not Implemented |
UU0206 # 09 Y:2022 | 09 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $983 | $375 | Not Implemented |
UU0206 # 02 Y:2022 | 02 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $79,430 | $1,500 | Implemented |
UU0206 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $139,892 | $110,800 | Implemented |
UU0206 # 05 Y:2022 | 05 | 2022 | MINIMIZE WATER USAGE | $5,292 | $1,764 | Implemented |
UU0206 # 07 Y:2022 | 07 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,868 | $1,019 | Implemented |
UU0206 # 06 Y:2022 | 06 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,388 | $5,440 | Not Implemented |
UU0206 # 03 Y:2022 | 03 | 2022 | MODIFY STARTUP/SHUTDOWN TIMES | $15,730 | $3,713 | Implemented |
UU0206 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,802 | $1,125 | Not Implemented |
UU0206 # 04 Y:2022 | 04 | 2022 | PAY UTILITY BILLS ON TIME | $23,515 | $750 | Implemented |
UU0196 # 01 Y:2022 | 01 | 2022 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $10,923 | $250 | Implemented |
UU0196 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,096 | $323 | Implemented |
UU0196 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,577 | $2,577 | Not Implemented |
UU0196 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $1,732 | $7,647 | Implemented |
UU0196 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $779 | $750 | Implemented |
UU0196 # 06 Y:2022 | 06 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $510 | $640 | Implemented |