Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
337
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0351 # 07 Y:2008 | 07 | 2008 | MODIFY STARTUP/SHUTDOWN TIMES | $84,567 | $63,000 | Not Implemented |
BD0351 # 06 Y:2008 | 06 | 2008 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $9,722 | $25,200 | Not Implemented |
BD0351 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,834 | $48,839 | Not Implemented |
BD0351 # 05 Y:2008 | 05 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $62,988 | $47,700 | Not Implemented |
BD0351 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $412 | $425 | Not Implemented |
BD0351 # 02 Y:2008 | 02 | 2008 | INSTALL OCCUPANCY SENSORS | $2,088 | $2,250 | Not Implemented |
BD0351 # 04 Y:2008 | 04 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,907 | $1,500 | Not Implemented |
UF0417 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,847 | $36,441 | Not Implemented |
UF0417 # 11 Y:2008 | 11 | 2008 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,200 | $4,158 | Not Implemented |
UF0417 # 03 Y:2008 | 03 | 2008 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,710 | $0 | Implemented |
UF0417 # 09 Y:2008 | 09 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $65,568 | $31,410 | Not Implemented |
UF0417 # 10 Y:2008 | 10 | 2008 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $45,096 | $15,000 | Not Implemented |
UF0417 # 07 Y:2008 | 07 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,601 | $64,339 | Not Implemented |
UF0417 # 05 Y:2008 | 05 | 2008 | INSTALL COMMON HEADER ON COMPRESSORS | $14,617 | $0 | Not Implemented |
UF0417 # 06 Y:2008 | 06 | 2008 | INSTALL COMMON HEADER ON COMPRESSORS | $12,647 | $900 | Not Implemented |
UF0417 # 08 Y:2008 | 08 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,201 | $1,200 | Not Implemented |
UF0417 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,992 | $0 | Implemented |
UF0417 # 02 Y:2008 | 02 | 2008 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,012 | $0 | Implemented |
OR0539 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $87,200 | $43,600 | Not Implemented |
OR0539 # 09 Y:2008 | 09 | 2008 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $78,900 | $132,800 | Not Implemented |
OR0539 # 13 Y:2008 | 13 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $7,300 | $5,700 | Not Implemented |
OR0539 # 05 Y:2008 | 05 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,317 | $72,600 | Not Implemented |
OR0539 # 04 Y:2008 | 04 | 2008 | USE SOLAR HEAT TO MAKE ELECTRICTY | $106,649 | $758,330 | Not Implemented |
OR0539 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $5,432 | $23,075 | Not Implemented |
OR0539 # 02 Y:2008 | 02 | 2008 | USE EXISTING DAM TO GENERATE ELECTRICITY | $31,589 | $50,000 | Not Implemented |