IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

194

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0253 # 05 Y:1995 05 1995 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,170 $0 Implemented
AM0253 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,500 $3,000 Implemented
AM0253 # 06 Y:1995 06 1995 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $727 $95 Implemented
AM0253 # 04 Y:1995 04 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,860 $5,720 Implemented
AM0253 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,250 $1,000 Implemented
AM0253 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $35,300 $92,500 Implemented
OR0251 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $69,966 $115,000 Implemented
OR0251 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,007 $9,588 Implemented
UM0044 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,745 $4,000 Implemented
UM0044 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $139 $350 Implemented
UM0044 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,738 $25,330 Implemented
UM0044 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,181 $1,433 Implemented
MA0348 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,011 $4,750 Implemented
MA0348 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,014 $1,200 Implemented
MA0348 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $852 $127 Implemented
UD0473 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,965 $8,000 Implemented
AR0070 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,086 $1,000 Implemented
AR0070 # 12 Y:1995 12 1995 MODIFY MATERIAL APPLICATION METHODS $300,000 $3,000 Implemented
AR0070 # 11 Y:1995 11 1995 MINIMIZE WATER USAGE $840 $200 Implemented
AR0070 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,997 $300 Implemented
AR0070 # 08 Y:1995 08 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,267 $0 Implemented
AR0070 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,147 $1,779 Implemented
AR0070 # 09 Y:1995 09 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $100,584 $0 Implemented
AR0070 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,430 $3,790 Implemented
AR0070 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,164 $10,900 Implemented