IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

439

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0174 # 06 Y:2000 06 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $5,080 $25,000 Not Implemented
UM0174 # 07 Y:2000 07 2000 $7,800 $2,000 Implemented
UM0173 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,300 $750 Not Implemented
UM0173 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $3,506 $800 Not Implemented
UM0173 # 03 Y:2000 03 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $758 $700 Not Implemented
UM0173 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $225 Not Implemented
UM0173 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $573 $800 Not Implemented
SF0200 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,619 $2,800 Not Implemented
SF0200 # 02 Y:2000 02 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,726 $7,750 Not Implemented
SF0200 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,122 $13,280 Not Implemented
SF0200 # 04 Y:2000 04 2000 RECOVER AND REUSE WASTE MATERIAL $24,800 $0 Not Implemented
SF0200 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,728 $70,000 Not Implemented
CO0473 # 01 Y:2000 01 2000 IMPROVE COMBUSTION CONTROL CAPABILITY $74,960 $1,050 Implemented
CO0473 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,150 $400 Implemented
CO0473 # 03 Y:2000 03 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,360 $10,000 Implemented
CO0473 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,980 $1,000 Implemented
CO0473 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,180 $6,780 Implemented
CO0473 # 06 Y:2000 06 2000 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,260 $500 Implemented
CO0473 # 07 Y:2000 07 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $107,610 $75,000 Implemented
CO0473 # 08 Y:2000 08 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $39,460 $10,000 Implemented
CO0473 # 09 Y:2000 09 2000 $587,500 $262,500 Not Implemented
CO0473 # 10 Y:2000 10 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $10,300 $26,000 Not Implemented
UM0172 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $821 $1,000 Not Implemented
UM0172 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,562 $1,200 Implemented
UM0172 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,550 $100 Not Implemented