IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

309

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UMS004 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,500 $0 Not Implemented
UMS004 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $40,000 $40,000 Not Implemented
UMS004 # 07 Y:2012 07 2012 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,300 $0 Not Implemented
SU0315 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,327 $0 Not Implemented
SU0315 # 02 Y:2012 02 2012 RECOVER AND REUSE SPENT ACID BATHS $28,847 $792 Not Implemented
SU0315 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,269 $1,357 Not Implemented
SU0315 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $317 $140 Not Implemented
SU0315 # 05 Y:2012 05 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $149 $652 Not Implemented
SU0315 # 06 Y:2012 06 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,502 $167,290 Not Implemented
SU0315 # 07 Y:2012 07 2012 OPTIMIZE PLANT POWER FACTOR $8,366 $42,403 Not Implemented
SU0315 # 08 Y:2012 08 2012 UPGRADE OBSOLETE EQUIPMENT $82 $436 Not Implemented
OK0819 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,728 $10,884 Not Implemented
OK0819 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,891 $16,296 Not Implemented
OK0819 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $199 $556 Implemented
OK0819 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,633 $560 Implemented
OK0819 # 05 Y:2012 05 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,206 $29,250 Implemented
OK0819 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,466 $0 Not Implemented
OK0819 # 07 Y:2012 07 2012 INSTALL TIMERS AND/OR THERMOSTATS $102 $353 Implemented
OK0819 # 08 Y:2012 08 2012 INSTALL EQUIPMENT TO MOVE PRODUCT $296,539 $350,000 Implemented
UA0072 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $17,176 $2,039 Implemented
UA0072 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,742 $3,900 Implemented
UA0072 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,647 $80 Implemented
UA0072 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $6,856 $7,937 Not Implemented
UA0072 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $1,851 $1,030 Not Implemented
UA0072 # 06 Y:2012 06 2012 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $3,939 $9,445 Not Implemented