IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

285

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1312 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,416 $6,400 Not Implemented
UK1312 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,264 $5,000 Implemented
UK1312 # 02 Y:2013 02 2013 UPGRADE OBSOLETE EQUIPMENT $54,717 $520,000 Implemented
UK1312 # 01 Y:2013 01 2013 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $138,049 $23,400 Not Implemented
NC0488 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $741 $2,535 Not Implemented
NC0488 # 01 Y:2013 01 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $83,386 $250,000 Not Implemented
NC0488 # 02 Y:2013 02 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,453 $300 Implemented
NC0488 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $627 $100 Implemented
MZ0126 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,531 $32,100 Not Implemented
MZ0126 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,501 $780 Implemented
MZ0126 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,939 $770 Not Implemented
MZ0126 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $328 $575 Not Implemented
NC0488 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,111 $1,500 Not Implemented
NC0488 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $600 Implemented
NC0488 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,980 $19,622 Implemented
NC0488 # 08 Y:2013 08 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $496 $0 Not Implemented
MZ0121 # 07 Y:2013 07 2013 INSTALL TIMERS AND/OR THERMOSTATS $4,131 $480 Not Implemented
MZ0121 # 13 Y:2013 13 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $209 $400 Not Implemented
MZ0121 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,138 $1,336 Implemented
MZ0121 # 05 Y:2013 05 2013 USE SYNTHETIC LUBRICANT $4,308 $56 Implemented
MZ0121 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $5,476 $5,441 Implemented
MZ0121 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $6,064 $5,148 Implemented
MZ0121 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $16,550 $1,370 Not Implemented
MZ0121 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,019 $19 Not Implemented
MZ0121 # 12 Y:2013 12 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $658 $0 Implemented