IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

888

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0365 # 06 Y:2010 06 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,455 $3,500 Implemented
UM0365 # 07 Y:2010 07 2010 USE OPTIMUM THICKNESS INSULATION $1,040 $22,500 Implemented
MS0350 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,024 $3,640 Implemented
MS0350 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,808 $380 Implemented
UD0808 # 16 Y:2009 16 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,446 $1,000 Implemented
UD0808 # 21 Y:2009 21 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,836 $0 Implemented
AM0567 # 02 Y:2009 02 2009 MODIFY WORKLOAD $3,265 $500 Implemented
AM0567 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $305 Implemented
DL0041 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,474 $10,800 Implemented
DL0041 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,029 $1,430 Implemented
DL0041 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $3,520 $400 Implemented
DL0041 # 07 Y:2009 07 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,000 $348 Implemented
DL0041 # 09 Y:2009 09 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,779 $3,858 Implemented
MS0337 # 01 Y:2009 01 2009 COVER OPEN TANKS $284,008 $8,869 Implemented
LE0283 # 02 Y:2009 02 2009 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $46,426 $38,000 Implemented
LE0283 # 03 Y:2009 03 2009 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $38,523 $560 Implemented
LE0283 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,658 $1,672 Implemented
LE0283 # 11 Y:2009 11 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $18,031 $30,000 Implemented
LE0283 # 12 Y:2009 12 2009 COVER OPEN TANKS $9,339 $10,000 Implemented
LE0283 # 23 Y:2009 23 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,799 $32,466 Implemented
LE0283 # 24 Y:2009 24 2009 INSTALL OCCUPANCY SENSORS $550 $600 Implemented
UF0417 # 02 Y:2008 02 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,012 $0 Implemented
UF0417 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,710 $0 Implemented
UF0417 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,992 $0 Implemented
UW0019 # 01 Y:2008 01 2008 REPLACE BOILER $16,074 $25,870 Implemented