Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0228 # 03 Y:2019 | 03 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $9,605 | $2,359 | Implemented |
IC0228 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,679 | $14,948 | Implemented |
IC0214 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,132 | $4,600 | Implemented |
IC0214 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,278 | $18,800 | Implemented |
IC0214 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,255 | $68,455 | Implemented |
IC0214 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $23,818 | $40,641 | Implemented |
IC0194 # 01 Y:2017 | 01 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $124,626 | $220,275 | Implemented |
IC0194 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $87,344 | $137,763 | Implemented |
UD0817 # 13 Y:2010 | 13 | 2010 | INSULATE BARE EQUIPMENT | $21,893 | $0 | Implemented |
UD0817 # 12 Y:2010 | 12 | 2010 | COVER OPEN TANKS | $10,386 | $0 | Implemented |
UD0817 # 11 Y:2010 | 11 | 2010 | USE OPTIMUM TEMPERATURE | $8,137 | $0 | Implemented |
UD0817 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,120 | $0 | Implemented |
UD0817 # 07 Y:2010 | 07 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $628 | $0 | Implemented |
UD0817 # 01 Y:2010 | 01 | 2010 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $66,672 | $600 | Implemented |
UD0817 # 15 Y:2010 | 15 | 2010 | INSULATE BARE EQUIPMENT | $3,996 | $0 | Implemented |
IC0084 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | $105 | $0 | Implemented |
IC0084 # 03 Y:2004 | 03 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,035 | $400 | Implemented |
IC0084 # 04 Y:2004 | 04 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $4,809 | $585 | Implemented |
IC0084 # 06 Y:2004 | 06 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $943 | $582,998 | Implemented |
IC0084 # 08 Y:2004 | 08 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $48,922 | $200 | Implemented |
IC0084 # 09 Y:2004 | 09 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $124,469 | $513 | Implemented |
IC0084 # 10 Y:2004 | 10 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $794 | $5,100 | Implemented |
IC0084 # 13 Y:2004 | 13 | 2004 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $197 | $240 | Implemented |
IC0084 # 11 Y:2004 | 11 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $122 | $0 | Implemented |
IC0077 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,807 | $2,963 | Implemented |