Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0296 # 09 Y:2024 | 09 | 2024 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $62,421 | $0 | Implemented |
IC0296 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,324 | $400 | Implemented |
IC0296 # 01 Y:2024 | 01 | 2024 | INSULATE BARE EQUIPMENT | $5,921 | $1,066 | Implemented |
IC0296 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,777 | $8,406 | Implemented |
IC0296 # 13 Y:2024 | 13 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $7,154 | $1,011 | Implemented |
IC0296 # 12 Y:2024 | 12 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,022 | $1,150 | Implemented |
IC0296 # 11 Y:2024 | 11 | 2024 | INSULATE BARE EQUIPMENT | $2,446 | $608 | Implemented |
IC0296 # 06 Y:2024 | 06 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,898 | $23,884 | Implemented |
IC0228 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,679 | $14,948 | Implemented |
IC0228 # 03 Y:2019 | 03 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $9,605 | $2,359 | Implemented |
IC0214 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,278 | $18,800 | Implemented |
IC0214 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,132 | $4,600 | Implemented |
IC0214 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,255 | $68,455 | Implemented |
IC0214 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $23,818 | $40,641 | Implemented |
IC0194 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $87,344 | $137,763 | Implemented |
IC0194 # 01 Y:2017 | 01 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $124,626 | $220,275 | Implemented |
UD0817 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,120 | $0 | Implemented |
UD0817 # 15 Y:2010 | 15 | 2010 | INSULATE BARE EQUIPMENT | $3,996 | $0 | Implemented |
UD0817 # 13 Y:2010 | 13 | 2010 | INSULATE BARE EQUIPMENT | $21,893 | $0 | Implemented |
UD0817 # 12 Y:2010 | 12 | 2010 | COVER OPEN TANKS | $10,386 | $0 | Implemented |
UD0817 # 11 Y:2010 | 11 | 2010 | USE OPTIMUM TEMPERATURE | $8,137 | $0 | Implemented |
UD0817 # 07 Y:2010 | 07 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $628 | $0 | Implemented |
UD0817 # 01 Y:2010 | 01 | 2010 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $66,672 | $600 | Implemented |
IC0084 # 04 Y:2004 | 04 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $4,809 | $585 | Implemented |
IC0084 # 06 Y:2004 | 06 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $943 | $582,998 | Implemented |