Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,097
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2309 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,846 | $33,462 | Not Implemented |
UC2309 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $136 | $38 | Not Implemented |
UC2309 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $155 | $494 | Not Implemented |
UC2309 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26 | $35 | Not Implemented |
UC2309 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $5,473 | $22,421 | Not Implemented |
UC2309 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,576 | $2,261 | Implemented |
UC2309 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,070 | $0 | Implemented |
UL2307 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,100 | $2,693 | Implemented |
UL2307 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,654 | $33,973 | Implemented |
UL2307 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,834 | $0 | Not Implemented |
UL2307 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $38,660 | $22,666 | Not Implemented |
UL2307 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $38,855 | $480,889 | Not Implemented |
UL2307 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,752 | $14,626 | Not Implemented |
UL2307 # 07 Y:2023 | 07 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $36,790 | $34,740 | Implemented |
UL2307 # 08 Y:2023 | 08 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $46,192 | $39,000 | Not Implemented |
CW0128 # 01 Y:2023 | 01 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $5,763 | $4,760 | n/a |
CW0128 # 02 Y:2023 | 02 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $215,269 | $246,950 | n/a |
CW0128 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $956 | $400 | n/a |
CW0128 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $2,001 | $8,583 | n/a |
CW0128 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,453 | $225 | n/a |
CW0128 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $8,800 | $26,211 | n/a |
WM0197 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,111 | $870 | Implemented |
WM0197 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,789 | $1,875 | Implemented |
WM0197 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,841 | $1,700 | Not Implemented |
WM0197 # 03 Y:2023 | 03 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $5,776 | $3,225 | Not Implemented |