Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0937 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,545 | $4,311 | Implemented |
GT0937 # 03 Y:2019 | 03 | 2019 | OPTIMIZE PLANT POWER FACTOR | $10,618 | $38,920 | Not Implemented |
GT0937 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,772 | $100,000 | Not Implemented |
GT0937 # 05 Y:2019 | 05 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $17,740 | $158,500 | Not Implemented |
GT0937 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $1,362 | $310 | Implemented |
UF0503 # 01 Y:2017 | 01 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $69,770 | $7,000 | Not Implemented |
UF0503 # 02 Y:2017 | 02 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,043 | $1,400 | Not Implemented |
UF0503 # 03 Y:2017 | 03 | 2017 | IMPROVE COMBUSTION CONTROL CAPABILITY | $9,797 | $2,182 | Not Implemented |
UF0503 # 04 Y:2017 | 04 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,014 | $0 | Not Implemented |
UF0503 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,268 | $0 | Not Implemented |
UF0503 # 06 Y:2017 | 06 | 2017 | USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER | $1,188 | $0 | Not Implemented |
UF0502 # 01 Y:2017 | 01 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $292,994 | $0 | Not Implemented |
UF0502 # 03 Y:2017 | 03 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $7,986 | $0 | Not Implemented |
UF0502 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,062 | $2,182 | Not Implemented |
UF0502 # 04 Y:2017 | 04 | 2017 | IMPROVE COMBUSTION CONTROL CAPABILITY | $2,634 | $0 | Not Implemented |
UF0502 # 05 Y:2017 | 05 | 2017 | REDESIGN PROCESS | $1,490 | $1,800 | Not Implemented |
UF0502 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,047 | $57 | Not Implemented |
MI0296 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,576 | $2,520 | Implemented |
MI0296 # 08 Y:2016 | 08 | 2016 | USE PHOTOCELL CONTROLS | $1,616 | $2,240 | Not Implemented |
MI0296 # 10 Y:2016 | 10 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $926 | $40 | Implemented |
MI0296 # 12 Y:2016 | 12 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $544 | $2,357 | Not Implemented |
MI0296 # 01 Y:2016 | 01 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,090 | $560 | Not Implemented |
MI0296 # 09 Y:2016 | 09 | 2016 | MINIMIZE WATER USAGE | $970 | $2,200 | Implemented |
MI0296 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,090 | $208 | Implemented |
MI0296 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,550 | $40 | Implemented |