IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0395 # 06 Y:2009 06 2009 KEEP BOILER TUBES CLEAN $826 $1,000 Not Implemented
NC0395 # 05 Y:2009 05 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,610 $2,170 Not Implemented
NC0395 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $207 $100 Not Implemented
NC0395 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $931 $0 Not Implemented
NC0395 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,614 $20,040 Not Implemented
NC0395 # 01 Y:2009 01 2009 DEVELOP A REPAIR/REPLACE POLICY $3,818 $5,618 Not Implemented
NC0241 # 02 Y:2002 02 2002 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,506 $6,000 Not Implemented
NC0241 # 03 Y:2002 03 2002 DEVELOP A REPAIR/REPLACE POLICY $4,751 $6,493 Implemented
NC0241 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $503 $576 Not Implemented
NC0241 # 05 Y:2002 05 2002 KEEP BOILER TUBES CLEAN $499 $1,600 Implemented
NC0241 # 01 Y:2002 01 2002 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,456 $8,000 Implemented
NC0140 # 09 Y:1998 09 1998 ADD ADDITIONAL PRODUCTION SHIFT $237,500 $12,000 Implemented
NC0140 # 08 Y:1998 08 1998 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $47,500 $135,000 Not Implemented
NC0140 # 07 Y:1998 07 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $5,400 $200 Not Implemented
NC0140 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,915 $1,448 Not Implemented
NC0140 # 05 Y:1998 05 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,555 $200 Implemented
NC0140 # 04 Y:1998 04 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,006 $6,000 Not Implemented
NC0140 # 03 Y:1998 03 1998 COVER OPEN TANKS $5,237 $10,500 Not Implemented
NC0140 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $4,227 $1,090 Implemented
NC0140 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $489 $852 Implemented
AT0079 # 01 Y:1987 01 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,080 $1,658 Not Implemented
AT0079 # 02 Y:1987 02 1987 IMPROVE LUBRICATION PRACTICES $1,728 $0 Not Implemented
AT0079 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $8,322 $900 Not Implemented
AT0079 # 04 Y:1987 04 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,142 $3,000 Not Implemented
AT0079 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,476 $0 Not Implemented