Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
94
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0171 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $717 | $3,440 | Not Implemented |
UM0171 # 03 Y:2000 | 03 | 2000 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,065 | $4,430 | Not Implemented |
UM0171 # 04 Y:2000 | 04 | 2000 | USE OTHER WASTE CONCENTRATION METHODS | $147,018 | $250,000 | Not Implemented |
UM0171 # 05 Y:2000 | 05 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $32,105 | $3,600 | Not Implemented |
UM0171 # 02 Y:2000 | 02 | 2000 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $15,476 | $30,000 | Not Implemented |
UM0171 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $187,954 | $165,000 | Implemented |
GT0698 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $85,596 | $65,000 | Not Implemented |
GT0698 # 10 Y:2000 | 10 | 2000 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $18,139 | $77,275 | Not Implemented |
GT0698 # 08 Y:2000 | 08 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,275 | $55,000 | Not Implemented |
GT0698 # 01 Y:2000 | 01 | 2000 | INSULATE BARE EQUIPMENT | $7,360 | $3,240 | Implemented |
GT0698 # 03 Y:2000 | 03 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,389 | $250 | Implemented |
GT0698 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $422 | $192 | Not Implemented |
GT0698 # 05 Y:2000 | 05 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $108,000 | $160,000 | Not Implemented |
GT0698 # 06 Y:2000 | 06 | 2000 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $59,243 | $300,000 | Implemented |
GT0698 # 07 Y:2000 | 07 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,235 | $1,800 | Implemented |
GT0698 # 09 Y:2000 | 09 | 2000 | FILTER AND REUSE HYDRAULIC OIL | $3,712 | $6,200 | Not Implemented |
AM0378 # 01 Y:2000 | 01 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $21,982 | $6,500 | Implemented |
AM0378 # 02 Y:2000 | 02 | 2000 | OPTIMIZE PLANT POWER FACTOR | $18,650 | $39,500 | Implemented |
AM0378 # 04 Y:2000 | 04 | 2000 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $13,630 | $699 | Implemented |
AM0378 # 06 Y:2000 | 06 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,638 | $0 | Not Implemented |
AM0378 # 05 Y:2000 | 05 | 2000 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $11,000 | $1,350 | Implemented |
AM0378 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,660 | $500 | Implemented |
AM0378 # 07 Y:2000 | 07 | 2000 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $4,000 | $0 | Implemented |
AM0378 # 09 Y:2000 | 09 | 2000 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,450 | $0 | Implemented |
AM0378 # 08 Y:2000 | 08 | 2000 | SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM | $3,610 | $0 | Implemented |