IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0417 # 10 Y:2008 10 2008 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $45,096 $15,000 Not Implemented
UF0417 # 05 Y:2008 05 2008 INSTALL COMMON HEADER ON COMPRESSORS $14,617 $0 Not Implemented
UF0417 # 06 Y:2008 06 2008 INSTALL COMMON HEADER ON COMPRESSORS $12,647 $900 Not Implemented
UF0417 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $65,568 $31,410 Not Implemented
UF0417 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,992 $0 Implemented
UF0417 # 07 Y:2008 07 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,601 $64,339 Not Implemented
UF0417 # 11 Y:2008 11 2008 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,200 $4,158 Not Implemented
UF0417 # 08 Y:2008 08 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,201 $1,200 Not Implemented
UF0417 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,847 $36,441 Not Implemented
UF0417 # 02 Y:2008 02 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,012 $0 Implemented
UF0417 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,710 $0 Implemented
OR0535 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,829 $47,094 Not Implemented
OR0535 # 03 Y:2008 03 2008 UPGRADE CONTROLS ON COMPRESSORS $43,923 $7,200 Not Implemented
OR0535 # 02 Y:2008 02 2008 CLEAN STEAM COILS IN PROCESSING TANKS $6,588 $1,250 Not Implemented
OR0535 # 01 Y:2008 01 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $46,153 $56,500 Not Implemented
OR0535 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $2,286 $1,850 Not Implemented
UW0019 # 01 Y:2008 01 2008 REPLACE BOILER $16,074 $25,870 Implemented
UW0019 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $14,046 $2,908 Not Implemented
UW0019 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $4,446 $2,439 Not Implemented
UW0019 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $15,042 $2,500 Not Implemented
BD0343 # 01 Y:2008 01 2008 USE RADIANT HEATER FOR SPOT HEATING $10,631 $12,501 Not Implemented
BD0343 # 06 Y:2008 06 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,874 $9,167 Not Implemented
BD0343 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $788 $788 Not Implemented
BD0343 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $188 $405 Not Implemented
BD0343 # 03 Y:2008 03 2008 INSTALL SKYLIGHTS $693 $5,713 Not Implemented