IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

554

matching recommendations
Reset
SIC 3312 Blast Furnaces And Steel Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0250 # 05 Y:2006 05 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,580 $596 Not Implemented
LL0250 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $427 $60 Not Implemented
LL0250 # 07 Y:2006 07 2006 USE PHOTOCELL CONTROLS $294 $30 Not Implemented
LL0251 # 01 Y:2006 01 2006 CONVERT TO OXYFUEL BURNERS $457,261 $150,000 Not Implemented
LL0251 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,258 $11,040 Not Implemented
LL0251 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $19,891 $2,392 Implemented
LL0251 # 04 Y:2006 04 2006 USE PHOTOCELL CONTROLS $4,548 $450 Not Implemented
LL0251 # 05 Y:2006 05 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,060 $3,280 Not Implemented
LL0251 # 06 Y:2006 06 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,767 $3,600 Not Implemented
LL0251 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $6,369 $9,300 Implemented
LL0251 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $634 $787 Implemented
LL0251 # 09 Y:2006 09 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $508 $960 Not Implemented
LL0251 # 10 Y:2006 10 2006 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $302 $930 Not Implemented
LL0251 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $245 Not Implemented
WI0499 # 01 Y:2005 01 2005 $42,000 $3,600 Implemented
WI0499 # 02 Y:2005 02 2005 INSTALL TIMERS AND/OR THERMOSTATS $9,925 $600 Implemented
WI0499 # 03 Y:2005 03 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,400 $0 Not Implemented
WI0499 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,192 $22,500 Implemented
WI0499 # 05 Y:2005 05 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,285 $300 Implemented
WI0499 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $967 $1,280 Implemented
WI0499 # 07 Y:2005 07 2005 INSTALL SPECTRAL REFLECTORS / DELAMP $344 $0 Implemented
IC0077 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,066 $2,100 Implemented
IC0077 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,003 $199 Implemented
IC0077 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,747 $74,730 Not Implemented
IC0077 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $4,888 Not Implemented