IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

554

matching recommendations
Reset
SIC 3312 Blast Furnaces And Steel Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0216 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,527 $8,775 Not Implemented
UA0216 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,592 $9,552 Not Implemented
UA0216 # 04 Y:2019 04 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $55,565 $163,736 Not Implemented
UA0216 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $67,295 $83,671 Not Implemented
UA0216 # 02 Y:2019 02 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $3,963 $927 Not Implemented
UA0216 # 01 Y:2019 01 2019 CONVERT TO OXYFUEL BURNERS $683,991 $1,000,000 Not Implemented
IC0194 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,741 $8,162 Not Implemented
IC0194 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,467 $8,000 Not Implemented
IC0194 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $87,344 $137,763 Implemented
IC0194 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $124,626 $220,275 Implemented
OK0968 # 07 Y:2017 07 2017 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $157,581 $3,000 Not Implemented
OK0968 # 06 Y:2017 06 2017 USE SHAFT TYPE FURNACES FOR PREHEATING INCOMING MATERIAL $670,334 $2,422,500 Not Implemented
OK0968 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,670 $90,081 Implemented
OK0968 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,717 $159,110 Implemented
OK0968 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,554 $1,388 Implemented
OK0968 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,490 $0 Implemented
OK0968 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,259 $3,000 Implemented
UF0503 # 06 Y:2017 06 2017 USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER $1,188 $0 Not Implemented
UF0503 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $3,268 $0 Not Implemented
UF0503 # 04 Y:2017 04 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $4,014 $0 Not Implemented
UF0503 # 03 Y:2017 03 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $9,797 $2,182 Not Implemented
UF0503 # 02 Y:2017 02 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,043 $1,400 Not Implemented
UF0503 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $69,770 $7,000 Not Implemented
OR0668 # 01 Y:2016 01 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $64,602 $27,375 Not Implemented
OR0668 # 02 Y:2016 02 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,966 $1,900 Implemented