Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 3312 | Blast Furnaces And Steel Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0333 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,573 | $950 | Not Implemented |
LE0333 # 05 Y:2012 | 05 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,865 | $1,000 | Not Implemented |
LE0333 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,510 | $7,490 | Not Implemented |
LE0333 # 04 Y:2012 | 04 | 2012 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,111 | $14,190 | Not Implemented |
LE0333 # 08 Y:2012 | 08 | 2012 | REDESIGN PROCESS | $513 | $5,280 | Not Implemented |
LE0333 # 06 Y:2012 | 06 | 2012 | REDUCE HEAT GAIN BY WINDOW TINTING | $4,369 | $0 | Not Implemented |
LE0333 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,876 | $12,800 | Not Implemented |
LE0333 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,424 | $1,000 | Not Implemented |
LE0331 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,156 | $12,800 | Not Implemented |
LE0331 # 05 Y:2012 | 05 | 2012 | REDESIGN PROCESS | $20,100 | $0 | Implemented |
LE0331 # 09 Y:2012 | 09 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $805 | $125 | Not Implemented |
LE0331 # 07 Y:2012 | 07 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,134 | $2,500 | Implemented |
LE0331 # 04 Y:2012 | 04 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $24,579 | $0 | Implemented |
LE0331 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,005 | $1,000 | Implemented |
LE0331 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,201 | $136,500 | Not Implemented |
LE0331 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $59,232 | $1,300 | Not Implemented |
LE0331 # 02 Y:2012 | 02 | 2012 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $42,903 | $73,485 | Not Implemented |
LE0283 # 23 Y:2009 | 23 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,799 | $32,466 | Implemented |
LE0283 # 14 Y:2009 | 14 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,947 | $7,000 | Not Implemented |
LE0283 # 13 Y:2009 | 13 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,598 | $2,400 | Not Implemented |
LE0283 # 12 Y:2009 | 12 | 2009 | COVER OPEN TANKS | $9,339 | $10,000 | Implemented |
LE0283 # 11 Y:2009 | 11 | 2009 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $18,031 | $30,000 | Implemented |
LE0283 # 06 Y:2009 | 06 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $27,445 | $10,500 | Not Implemented |
LE0283 # 05 Y:2009 | 05 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $28,610 | $12,000 | Not Implemented |
LE0283 # 02 Y:2009 | 02 | 2009 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $46,426 | $38,000 | Implemented |