IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

289

matching recommendations
Reset
SIC 3315 Steel Wire And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0014 # 06 Y:1987 06 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $431 $700 Implemented
WI0011 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,151 $0 Implemented
WI0011 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,974 $4,177 Implemented
WI0011 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $983 $500 Implemented
GT0318 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,650 $41,030 Implemented
GT0318 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,380 $8,000 Implemented
GT0318 # 05 Y:1987 05 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,290 $1,500 Implemented
GT0318 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $940 $0 Implemented
KU0209 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,981 $20,000 Implemented
KU0209 # 07 Y:1986 07 1986 INSTALL TIMERS AND/OR THERMOSTATS $3,611 $945 Implemented
KU0209 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,187 $5,000 Implemented
KU0209 # 09 Y:1986 09 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,209 $3,372 Implemented
KU0209 # 12 Y:1986 12 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $809 $0 Implemented
KU0209 # 13 Y:1986 13 1986 KEEP BOILER TUBES CLEAN $796 $1,600 Implemented
KU0209 # 14 Y:1986 14 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $736 $50 Implemented
KU0209 # 15 Y:1986 15 1986 INSTALL TURBULATORS $392 $2,500 Implemented
KU0209 # 16 Y:1986 16 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $353 $50 Implemented
KU0209 # 17 Y:1986 17 1986 USE COMPRESSOR AIR FILTERS $161 $50 Implemented
KU0209 # 18 Y:1986 18 1986 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $135 $0 Implemented
MA0062 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,443 $20,000 Implemented
MA0062 # 04 Y:1986 04 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $202 $140 Implemented
MA0062 # 05 Y:1986 05 1986 REPAIR AND ELIMINATE STEAM LEAKS $446 $30 Implemented
MA0049 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $721 $500 Implemented
ST0033 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,963 $0 Implemented
ST0033 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $576 $100 Implemented