IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

661

matching recommendations
Reset
SIC 3315 Steel Wire And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0798 # 01 Y:2010 01 2010 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $176,587 $1,026,000 Not Implemented
OK0798 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,758 $239,328 Not Implemented
OK0798 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,085 $5,205 Implemented
OK0798 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $203 $2,009 Implemented
OK0798 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,826 $900 Implemented
OK0798 # 06 Y:2010 06 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,240 $0 Implemented
OK0798 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,000 $0 Implemented
OK0798 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $8,199 $2,430 Implemented
OK0798 # 09 Y:2010 09 2010 INSTALL SET-BACK TIMERS $3,115 $1,503 Not Implemented
OK0798 # 10 Y:2010 10 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,239 $11,718 Not Implemented
OK0798 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,120 $1,991 Implemented
NC0395 # 01 Y:2009 01 2009 DEVELOP A REPAIR/REPLACE POLICY $3,818 $5,618 Not Implemented
NC0395 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,614 $20,040 Not Implemented
NC0395 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $931 $0 Not Implemented
NC0395 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $207 $100 Not Implemented
NC0395 # 05 Y:2009 05 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,610 $2,170 Not Implemented
NC0395 # 06 Y:2009 06 2009 KEEP BOILER TUBES CLEAN $826 $1,000 Not Implemented
IC0154 # 11 Y:2009 11 2009 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,094 $0 Not Implemented
IC0154 # 10 Y:2009 10 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,269 $0 Not Implemented
IC0154 # 09 Y:2009 09 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $725 $1,126 Not Implemented
IC0154 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $87 $0 Not Implemented
IC0154 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $220 $460 Not Implemented
IC0154 # 06 Y:2009 06 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $178 $240 Not Implemented
IC0154 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $180 $896 Not Implemented
IC0154 # 04 Y:2009 04 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $173 $474 Not Implemented