IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 3315 Steel Wire And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0536 # 01 Y:2016 01 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $91,093 $350,298 Not Implemented
SD0536 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,278 $1,200 Implemented
SD0536 # 04 Y:2016 04 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,259 $11,760 Not Implemented
SD0536 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,468 $8,787 Not Implemented
SD0536 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,472 $200 Not Implemented
SD0536 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $1,796 $2,742 Implemented
SD0536 # 07 Y:2016 07 2016 USE PHOTOCELL CONTROLS $2,367 $3,700 Not Implemented
SD0536 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,995 $648 Implemented
SD0536 # 05 Y:2016 05 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,594 $11,180 Not Implemented
SD0536 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $1,296 $3,200 Implemented
SD0536 # 02 Y:2016 02 2016 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $23,163 $68,259 Not Implemented
SD0370 # 01 Y:2005 01 2005 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $19,420 $28,950 Not Implemented
SD0370 # 03 Y:2005 03 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,916 $25,000 Not Implemented
SD0370 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,731 $24,510 Not Implemented
SD0370 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,267 $160 Not Implemented
SD0370 # 07 Y:2005 07 2005 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,096 $17,000 Not Implemented
SD0370 # 02 Y:2005 02 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,581 $22,500 Not Implemented
SD0370 # 05 Y:2005 05 2005 COVER OPEN TANKS $4,121 $1,428 Not Implemented
SD0363 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,335 $12,575 Not Implemented
SD0363 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $4,442 $8,400 Not Implemented
SD0363 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,107 $4,600 Not Implemented
SD0363 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,580 $640 Not Implemented
SD0363 # 07 Y:2005 07 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,445 $230 Not Implemented
SD0363 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,090 $31,655 Implemented
SD0363 # 09 Y:2005 09 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $229,203 $92,000 Not Implemented