IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3315 Steel Wire And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0413 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $973 $1,000 Implemented
LE0413 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,124 $500 Implemented
LE0413 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,494 $725 Implemented
LE0413 # 05 Y:2016 05 2016 INSTALL TIMERS AND/OR THERMOSTATS $482 $590 Implemented
LE0413 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,404 $15,000 Implemented
LE0413 # 07 Y:2016 07 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,462 $25,000 Implemented
LE0406 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,200 $0 Implemented
LE0406 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,001 $300 Implemented
LE0406 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,582 $1,000 Implemented
LE0406 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $6,858 $8,310 Implemented
LE0406 # 07 Y:2015 07 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,691 $65,000 Implemented
LE0390 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $47,479 $25,500 Implemented
WV0308 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,560 $110 Implemented
WV0308 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,364 $3,520 Implemented
WV0308 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $2,037 $124 Implemented
WV0308 # 03 Y:2005 03 2005 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,526 $714 Implemented
WV0308 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,156 $4,132 Implemented
WV0308 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $1,350 $72 Implemented
WV0308 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,329 $0 Implemented
LE0120 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $2,562 $200 Implemented
LE0120 # 04 Y:2001 04 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,381 $0 Implemented
LE0120 # 03 Y:2001 03 2001 IMPROVE LUBRICATION PRACTICES $13,290 $800 Implemented
LE0120 # 02 Y:2001 02 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,995 $1,000 Implemented
HO0050 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $67 $204 Implemented
HO0050 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $319 $285 Implemented