IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 3316 Cold Finishing Of Steel Shapes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0946 # 01 Y:2016 01 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,504 $500 Implemented
UD0946 # 02 Y:2016 02 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,148 $1,660 Not Implemented
UD0946 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $776 $400 Not Implemented
UD0946 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $3,057 $2,000 Not Implemented
UD0946 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $304 $0 Implemented
UD0946 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,478 $77,725 Not Implemented
UD0946 # 07 Y:2016 07 2016 DEVELOP A REPAIR/REPLACE POLICY $462 $2,400 Implemented
UD0946 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $214 $0 Not Implemented
WV0321 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,415 $1,613 Implemented
WV0321 # 10 Y:2005 10 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $532 $140 Not Implemented
WV0321 # 02 Y:2005 02 2005 UPGRADE CONVEYORS $2,844 $4,000 Not Implemented
WV0321 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,508 $9,090 Implemented
WV0321 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,125 $454 Implemented
WV0321 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,363 $25 Implemented
WV0321 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,363 $2,650 Implemented
WV0321 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,340 $210 Not Implemented
WV0321 # 08 Y:2005 08 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,323 $1,782 Not Implemented
WV0321 # 09 Y:2005 09 2005 DEVELOP A REPAIR/REPLACE POLICY $875 $312 Implemented
UD0711 # 07 Y:2005 07 2005 UPGRADE CONTROLS ON COMPRESSORS $4,427 $600 Not Implemented
UD0711 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,651 $1,240 Implemented
UD0711 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,813 $2,025 Implemented
UD0711 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,341 $80,215 Not Implemented
UD0711 # 03 Y:2005 03 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $113,328 $400,000 Not Implemented
UD0711 # 02 Y:2005 02 2005 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $143,601 $246,784 Not Implemented
UD0711 # 01 Y:2005 01 2005 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $343,339 $10,000 Not Implemented