IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

568

matching recommendations
Reset
SIC 3317 Steel Pipe And Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0274 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $6,510 $1,958 Not Implemented
OK0274 # 03 Y:1989 03 1989 INSULATE BARE EQUIPMENT $23,241 $3,556 Implemented
OK0274 # 04 Y:1989 04 1989 COVER OPEN TANKS $11,365 $1,986 Not Implemented
OK0274 # 05 Y:1989 05 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,511 $15,480 Not Implemented
OK0274 # 06 Y:1989 06 1989 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,113 $1,925 Implemented
OK0274 # 07 Y:1989 07 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,496 $6,200 Not Implemented
OR0037 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,463 $0 Not Implemented
OR0037 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,466 $300 Not Implemented
OR0037 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,754 $500 Implemented
OR0037 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,296 $10,000 Implemented
OR0037 # 05 Y:1988 05 1988 INSULATE BARE EQUIPMENT $1,893 $2,025 Not Implemented
OR0037 # 06 Y:1988 06 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $91 $176 Implemented
OR0037 # 07 Y:1988 07 1988 OPTIMIZE PLANT POWER FACTOR $2,309 $6,000 Implemented
RU0023 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,259 $134 Not Implemented
RU0023 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $313 $202 Implemented
RU0023 # 03 Y:1988 03 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,940 $0 Implemented
RU0023 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $340 $186 Implemented
RU0023 # 05 Y:1988 05 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,880 $3,250 Implemented
CO0094 # 01 Y:1987 01 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,314 $500 Implemented
CO0094 # 02 Y:1987 02 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,349 $400 Implemented
CO0094 # 03 Y:1987 03 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,535 $576 Implemented
CO0094 # 04 Y:1987 04 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,336 $300 Implemented
CO0094 # 05 Y:1987 05 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,799 $10,000 Not Implemented
CO0094 # 06 Y:1987 06 1987 INSTALL TURBULATORS $457 $720 Implemented
CO0094 # 07 Y:1987 07 1987 INSTALL TIMERS AND/OR THERMOSTATS $9,979 $4,500 Implemented