IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

568

matching recommendations
Reset
SIC 3317 Steel Pipe And Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0180 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,587 $100,037 Implemented
TT0180 # 03 Y:2016 03 2016 UPGRADE CONTROLS ON COMPRESSORS $25,771 $40,000 Implemented
TT0180 # 01 Y:2016 01 2016 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $27,451 $700 Implemented
TT0180 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,289 $0 Implemented
MI0296 # 01 Y:2016 01 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,090 $560 Not Implemented
MI0296 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $17,090 $208 Implemented
MI0296 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,550 $40 Implemented
MI0296 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,501 $21,680 Not Implemented
MI0296 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,548 $1,660 Implemented
MI0296 # 06 Y:2016 06 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,937 $4,464 Implemented
MI0296 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,576 $2,520 Implemented
MI0296 # 08 Y:2016 08 2016 USE PHOTOCELL CONTROLS $1,616 $2,240 Not Implemented
MI0296 # 09 Y:2016 09 2016 MINIMIZE WATER USAGE $970 $2,200 Implemented
MI0296 # 10 Y:2016 10 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $926 $40 Implemented
MI0296 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $746 $440 Implemented
MI0296 # 12 Y:2016 12 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $544 $2,357 Not Implemented
AM0704 # 13 Y:2016 13 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $320 $0 Not Implemented
AM0704 # 12 Y:2016 12 2016 OPTIMIZE PLANT POWER FACTOR $918 $3,100 Implemented
AM0704 # 11 Y:2016 11 2016 USE PHOTOCELL CONTROLS $2,440 $650 Implemented
AM0704 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $203,006 $0 Implemented
AM0704 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $101,844 $0 Implemented
AM0704 # 03 Y:2016 03 2016 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $32,650 $9,000 Implemented
AM0704 # 04 Y:2016 04 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $91,870 $0 Implemented
AM0704 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $23,510 $20,730 Implemented
AM0704 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,685 $28,500 Implemented