IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

568

matching recommendations
Reset
SIC 3317 Steel Pipe And Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0072 # 07 Y:2012 07 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,750 $415 Not Implemented
OK0813 # 01 Y:2011 01 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $116,318 $187,782 Not Implemented
OK0813 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,531 $65,527 Implemented
OK0813 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,048 $6,145 Not Implemented
OK0813 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,656 $11,978 Not Implemented
OK0813 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,469 $7,737 Implemented
OK0813 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,231 $64,515 Implemented
OK0813 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $19,954 $13,110 Implemented
OK0813 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,672 $990 Implemented
OK0813 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $1,037 $190 Implemented
OK0813 # 10 Y:2011 10 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $19,937 $8,250 Not Implemented
OK0813 # 11 Y:2011 11 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,447 $25,472 Implemented
TT0051 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $30,200 $50,000 Not Implemented
TT0051 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,895 $4,900 Not Implemented
TT0051 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $8,500 $15,750 Not Implemented
TT0051 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,300 $2,800 Not Implemented
AM0567 # 01 Y:2009 01 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,925 $1,020 Not Implemented
AM0567 # 02 Y:2009 02 2009 $3,265 $500 Implemented
AM0567 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,035 $20 Not Implemented
AM0567 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $305 Implemented
DL0041 # 01 Y:2009 01 2009 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $29,782 $0 Not Implemented
DL0041 # 02 Y:2009 02 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,570 $372 Not Implemented
DL0041 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,474 $10,800 Implemented
DL0041 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,029 $1,430 Implemented
DL0041 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $3,520 $400 Implemented