Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
568
matching recommendationsSIC | 3317 | Steel Pipe And Tubes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0072 # 07 Y:2012 | 07 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,750 | $415 | Not Implemented |
OK0813 # 01 Y:2011 | 01 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $116,318 | $187,782 | Not Implemented |
OK0813 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,531 | $65,527 | Implemented |
OK0813 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,048 | $6,145 | Not Implemented |
OK0813 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,656 | $11,978 | Not Implemented |
OK0813 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,469 | $7,737 | Implemented |
OK0813 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,231 | $64,515 | Implemented |
OK0813 # 07 Y:2011 | 07 | 2011 | OPTIMIZE PLANT POWER FACTOR | $19,954 | $13,110 | Implemented |
OK0813 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,672 | $990 | Implemented |
OK0813 # 09 Y:2011 | 09 | 2011 | INSULATE BARE EQUIPMENT | $1,037 | $190 | Implemented |
OK0813 # 10 Y:2011 | 10 | 2011 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $19,937 | $8,250 | Not Implemented |
OK0813 # 11 Y:2011 | 11 | 2011 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $8,447 | $25,472 | Implemented |
TT0051 # 01 Y:2010 | 01 | 2010 | OPTIMIZE PLANT POWER FACTOR | $30,200 | $50,000 | Not Implemented |
TT0051 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,895 | $4,900 | Not Implemented |
TT0051 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $8,500 | $15,750 | Not Implemented |
TT0051 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $1,300 | $2,800 | Not Implemented |
AM0567 # 01 Y:2009 | 01 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,925 | $1,020 | Not Implemented |
AM0567 # 02 Y:2009 | 02 | 2009 | MODIFY WORKLOAD | $3,265 | $500 | Implemented |
AM0567 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,035 | $20 | Not Implemented |
AM0567 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $668 | $305 | Implemented |
DL0041 # 01 Y:2009 | 01 | 2009 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $29,782 | $0 | Not Implemented |
DL0041 # 02 Y:2009 | 02 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $20,570 | $372 | Not Implemented |
DL0041 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,474 | $10,800 | Implemented |
DL0041 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,029 | $1,430 | Implemented |
DL0041 # 05 Y:2009 | 05 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,520 | $400 | Implemented |