IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 3317 Steel Pipe And Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0343 # 06 Y:2008 06 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,874 $9,167 Not Implemented
BD0343 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $788 $788 Not Implemented
BD0343 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $188 $405 Not Implemented
BD0343 # 03 Y:2008 03 2008 INSTALL SKYLIGHTS $693 $5,713 Not Implemented
BD0343 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,924 $6,730 Not Implemented
BD0343 # 01 Y:2008 01 2008 USE RADIANT HEATER FOR SPOT HEATING $10,631 $12,501 Not Implemented
BD0333 # 08 Y:2007 08 2007 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $66,946 $2 Not Implemented
BD0333 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $378 $2 Implemented
BD0333 # 01 Y:2007 01 2007 INSTALL OCCUPANCY SENSORS $1,570 $901 Implemented
BD0333 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $376 $476 Implemented
BD0333 # 03 Y:2007 03 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $36,206 $15,001 Not Implemented
BD0333 # 04 Y:2007 04 2007 USE RADIANT HEATER FOR SPOT HEATING $73,372 $30,001 Not Implemented
BD0333 # 05 Y:2007 05 2007 RECOVER WASTE HEAT FROM EQUIPMENT $67,989 $35,001 Not Implemented
BD0333 # 06 Y:2007 06 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $819 $526 Implemented
BD0120 # 02 Y:1998 02 1998 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $4,250 $4,000 Not Implemented
BD0120 # 09 Y:1998 09 1998 $332 $0 Not Implemented
BD0120 # 08 Y:1998 08 1998 $2,430 $1,000 Not Implemented
BD0120 # 07 Y:1998 07 1998 MINIMIZE WATER USAGE $1,780 $750 Not Implemented
BD0120 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $985 $750 Not Implemented
BD0120 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,992 $500 Not Implemented
BD0120 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,527 $400 Not Implemented
BD0120 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,816 $11,230 Implemented
BD0120 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,459 $600 Implemented
WI0281 # 10 Y:1996 10 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,554 $701 Implemented
WI0281 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,144 $12,950 Not Implemented