IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0116 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,897 $0 Implemented
HO0222 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $697 $600 Implemented
HO0222 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $30,000 $4,000 Implemented
HO0222 # 05 Y:2000 05 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $723 $4,000 Implemented
HO0222 # 09 Y:2000 09 2000 RECYCLE CASTING SAND $5,475 $500 Implemented
HO0222 # 10 Y:2000 10 2000 METER WASTE WATER $902 $0 Implemented
HO0222 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,727 $8,392 Implemented
HO0174 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,918 $1,500 Implemented
HO0174 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,300 $0 Implemented
HO0174 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,898 $20,287 Implemented
WV0123 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $127 Implemented
WV0123 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,494 $27,687 Implemented
WV0123 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,827 $920 Implemented
WV0123 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $32,948 $910 Implemented
WV0121 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,277 $420 Implemented
WV0121 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,836 $24,738 Implemented
WV0121 # 04 Y:1997 04 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,392 $600 Implemented
WV0121 # 05 Y:1997 05 1997 USE SYNTHETIC LUBRICANT $807 $360 Implemented
WV0121 # 06 Y:1997 06 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $23,400 $0 Implemented
WV0121 # 08 Y:1997 08 1997 CLEAR AND RENT EXISTING SPACE $4,000 $1,600 Implemented
RU0028 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $590 $500 Implemented
RU0028 # 03 Y:1988 03 1988 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,470 $8,240 Implemented
RU0028 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,347 $302 Implemented