Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0224 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $474 | $663 | Implemented |
MZ0224 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,705 | $1,263 | Implemented |
MZ0224 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,978 | $2,200 | Implemented |
MZ0111 # 05 Y:2013 | 05 | 2013 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $7,873 | $900 | Implemented |
MZ0111 # 03 Y:2013 | 03 | 2013 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $283 | $680 | Implemented |
MZ0046 # 06 Y:2009 | 06 | 2009 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $8,620 | $1,800 | Implemented |
MZ0046 # 09 Y:2009 | 09 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $10,100 | $8,000 | Implemented |
MZ0046 # 08 Y:2009 | 08 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,483 | $0 | Implemented |
MZ0046 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,771 | $0 | Implemented |
MZ0046 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,749 | $1,300 | Implemented |
MZ0046 # 03 Y:2009 | 03 | 2009 | INSTALL OCCUPANCY SENSORS | $18,406 | $1,380 | Implemented |
MZ0046 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,025 | $14,100 | Implemented |
MZ0046 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,631 | $54,630 | Implemented |
KU0378 # 04 Y:1992 | 04 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,739 | $720 | Implemented |
KU0378 # 06 Y:1992 | 06 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,100 | $400 | Implemented |
KU0325 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,200 | $3,078 | Implemented |
KU0325 # 07 Y:1990 | 07 | 1990 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $50,733 | $0 | Implemented |
KU0325 # 06 Y:1990 | 06 | 1990 | REDUCE VENTILATION AIR | $8,297 | $11,700 | Implemented |
KU0325 # 05 Y:1990 | 05 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $675 | $1,416 | Implemented |
KU0325 # 03 Y:1990 | 03 | 1990 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $391 | $466 | Implemented |