IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,069

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0878 # 02 Y:2013 02 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,314 $9,180 Implemented
UD0878 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,934 $0 Not Implemented
UD0878 # 04 Y:2013 04 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,749 $19,400 Not Implemented
UD0878 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,303 $1,000 Implemented
UD0878 # 06 Y:2013 06 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,575 $15,000 Implemented
UD0878 # 07 Y:2013 07 2013 MINIMIZE WATER USAGE $21,594 $4,000 Not Implemented
UD0878 # 08 Y:2013 08 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,800 $2,000 Not Implemented
UD0878 # 09 Y:2013 09 2013 USE RADIANT HEATER FOR SPOT HEATING $20,903 $15,000 Not Implemented
IP0010 # 01 Y:2013 01 2013 APPLY FOR INVESTMENT INCENTIVES $4,545 $0 Implemented
IP0010 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,822 $0 Implemented
IP0010 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $446 $0 Implemented
IP0010 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $17,755 $1,700 Not Implemented
IP0010 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,962 $107 Implemented
IP0010 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $1,488 $430 Not Implemented
IP0010 # 07 Y:2013 07 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $571 $221 Implemented
IP0010 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $103 $70 Not Implemented
IP0010 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,108 $1,795 Implemented
IP0010 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,207 $2,916 Not Implemented
IP0010 # 11 Y:2013 11 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $18,512 $51,858 Not Implemented
IP0010 # 12 Y:2013 12 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,469 $15,876 Implemented
IP0010 # 13 Y:2013 13 2013 OPTIMIZE PLANT POWER FACTOR $2,850 $8,526 Implemented
LE0362 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $162,427 $899,500 Implemented
LE0362 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $764 $1,373 Not Implemented
LE0362 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,545 $546 Implemented
LE0362 # 04 Y:2013 04 2013 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $41,942 $191,591 Not Implemented