IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0135 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,333 $5,604 Not Implemented
UA0135 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,250 $5,480 Not Implemented
UA0135 # 03 Y:2015 03 2015 UPGRADE CONTROLS ON COMPRESSORS $19,427 $5,250 Not Implemented
UA0135 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $79,593 $13,795 Not Implemented
UA0135 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $101,481 $4,160 Not Implemented
UA0135 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $115,247 $202,454 Not Implemented
UA0135 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,926 $10,430 Implemented
UA3012 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,047 $58,885 Not Implemented
UA3012 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,962 $6,000 Not Implemented
UA3012 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $18,630 $20,000 Not Implemented
UA3012 # 07 Y:2011 07 2011 USE OPTIMUM THICKNESS INSULATION $6,587 $120 Implemented
UA3012 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $8,066 $30 Implemented
UA3012 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $983 $170 Implemented
UA3012 # 04 Y:2011 04 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,412 $4,440 Not Implemented
UA0044 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,400 $0 Implemented
UA0044 # 02 Y:2010 02 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,187 $0 Implemented
UA0044 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $31,813 $50,000 Implemented
UA0044 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,108 $0 Not Implemented
UA0044 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,303 $11,000 Implemented
UA0044 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,858 $2,000 Implemented
UA0044 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $25,366 $0 Implemented
UA0044 # 08 Y:2010 08 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $166 $320 Not Implemented
UA0044 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,163 $0 Not Implemented
UA0044 # 10 Y:2010 10 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $91,712 $375,000 Not Implemented
UA0044 # 11 Y:2010 11 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $786 $494 Not Implemented