Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0476 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,239 $121,403 Implemented
SF0476 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,324 $215 Implemented
LM0118 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $969 $2,578 Not Implemented
LM0118 # 01 Y:2006 01 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $8,571 $10,004 Not Implemented
LM0118 # 04 Y:2006 04 2006 UPGRADE CONTROLS ON COMPRESSORS $5,931 $0 Not Implemented
LM0118 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,104 $425 Implemented
LM0091 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $28,000 $1,260 Not Implemented
LM0091 # 05 Y:2005 05 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,750 $200 Implemented
LM0091 # 06 Y:2005 06 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $16,875 $2,150 Implemented
LM0091 # 07 Y:2005 07 2005 MOVE PRODUCT USING MECHANICAL MEANS $16,875 $1,600 Implemented
LM0091 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $709 $300 Implemented
LM0091 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,029 $683 Implemented
LM0091 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $764 $240 Implemented
SF0234 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,719 $46,531 Not Implemented
SF0234 # 08 Y:2002 08 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,441 $49,000 Implemented
SF0234 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,310 $14,027 Not Implemented
SF0234 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,974 $10,307 Not Implemented
SF0234 # 04 Y:2002 04 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $904 $1,304 Not Implemented
SF0234 # 03 Y:2002 03 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $988 $1,250 Not Implemented
SF0234 # 02 Y:2002 02 2002 USE PHOTOCELL CONTROLS $8,489 $6,960 Not Implemented
SF0234 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,185 $300 Implemented
SD0280 # 12 Y:2001 12 2001 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $13,200 $35,000 Not Implemented
SD0280 # 05 Y:2001 05 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,537 $5,000 Not Implemented
SD0280 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,928 $18,000 Not Implemented
SD0280 # 07 Y:2001 07 2001 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $16,954 $30,000 Not Implemented