Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,069
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0330 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,750 | $12,000 | Not Implemented |
UM0330 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,366 | $5,250 | Not Implemented |
UM0330 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $1,775 | $516 | Not Implemented |
UM0330 # 04 Y:2007 | 04 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,732 | $1,300 | Not Implemented |
UM0330 # 05 Y:2007 | 05 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,605 | $500 | Not Implemented |
UM0330 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,228 | $4,500 | Not Implemented |
UM0330 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $954 | $1,500 | Not Implemented |
UM0330 # 08 Y:2007 | 08 | 2007 | COVER OPEN TANKS | $733 | $1,000 | Not Implemented |
UM0329 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $154,115 | $300,000 | Not Implemented |
UM0329 # 02 Y:2007 | 02 | 2007 | COVER OPEN TANKS | $115,389 | $140,000 | Implemented |
UM0329 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $74,880 | $39,375 | Implemented |
UM0329 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,784 | $265,000 | Not Implemented |
UM0329 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,455 | $6,300 | Implemented |
LE0263 # 01 Y:2007 | 01 | 2007 | USE SOLAR HEAT TO MAKE ELECTRICTY | $88,058 | $368,500 | Not Implemented |
LE0263 # 02 Y:2007 | 02 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $59,097 | $300 | Not Implemented |
LE0263 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $103,515 | $150,000 | Not Implemented |
LE0263 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,993 | $70,000 | Not Implemented |
LE0263 # 05 Y:2007 | 05 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $25,485 | $20,000 | Not Implemented |
LE0263 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,639 | $1,000 | Not Implemented |
LE0263 # 07 Y:2007 | 07 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,256 | $50,000 | Not Implemented |
LE0263 # 08 Y:2007 | 08 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,899 | $22,894 | Not Implemented |
LE0263 # 09 Y:2007 | 09 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,837 | $6,837 | Not Implemented |
LE0263 # 10 Y:2007 | 10 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,781 | $6,000 | Not Implemented |
LE0263 # 11 Y:2007 | 11 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,214 | $1,000 | Not Implemented |
LE0263 # 12 Y:2007 | 12 | 2007 | INSTALL OCCUPANCY SENSORS | $2,460 | $1,200 | Not Implemented |