IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,069

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0730 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $767 Implemented
OK0730 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,565 $8,601 Not Implemented
OK0730 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,886 $1,767 Implemented
LM0118 # 01 Y:2006 01 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $8,571 $10,004 Not Implemented
LM0118 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $969 $2,578 Not Implemented
LM0118 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,104 $425 Implemented
LM0118 # 04 Y:2006 04 2006 UPGRADE CONTROLS ON COMPRESSORS $5,931 $0 Not Implemented
LE0214 # 01 Y:2005 01 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,742 $30,000 Not Implemented
LE0214 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,637 $5,500 Implemented
LE0214 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,017 $320 Implemented
LE0214 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,291 $640 Not Implemented
LE0214 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $3,259 $2,300 Implemented
LE0214 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,575 $500 Implemented
UM0277 # 01 Y:2005 01 2005 REDUCE SCRAP PRODUCTION $34,320 $7,500 Implemented
UM0277 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,442 $1,000 Implemented
UM0277 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,729 $3,000 Not Implemented
UM0277 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,247 $1,000 Implemented
LM0091 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $709 $300 Implemented
LM0091 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,029 $683 Implemented
LM0091 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $764 $240 Implemented
LM0091 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $28,000 $1,260 Not Implemented
LM0091 # 05 Y:2005 05 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,750 $200 Implemented
LM0091 # 06 Y:2005 06 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $16,875 $2,150 Implemented
LM0091 # 07 Y:2005 07 2005 MOVE PRODUCT USING MECHANICAL MEANS $16,875 $1,600 Implemented
UM0268 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,159 $14,530 Not Implemented