IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,069

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0051 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $0 Implemented
NC0254 # 01 Y:2003 01 2003 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $639,636 $10,000 n/a
NC0254 # 02 Y:2003 02 2003 INSTALL SENSORS TO DETECT DEFECTS $85,500 $3,000 Implemented
NC0254 # 03 Y:2003 03 2003 MODIFY STARTUP/SHUTDOWN TIMES $1,342,708 $10,000 Implemented
NC0254 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,930 $20,000 Not Implemented
NC0254 # 05 Y:2003 05 2003 COVER OPEN TANKS $14,740 $0 Not Implemented
NC0254 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $546 $1,000 Not Implemented
NC0254 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,899 $500 Implemented
NC0254 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,127 $24,350 Not Implemented
NC0254 # 09 Y:2003 09 2003 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $88,312 $160,000 Not Implemented
NC0254 # 10 Y:2003 10 2003 IMPROVE SPACE COMFORT CONDITIONING $175,198 $307,000 Not Implemented
UD0664 # 01 Y:2003 01 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $115,000 $1,000 Not Implemented
UD0664 # 02 Y:2003 02 2003 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $61,800 $144,000 Not Implemented
UD0664 # 03 Y:2003 03 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $61,795 $35,000 Implemented
UD0664 # 04 Y:2003 04 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $37,413 $28,500 n/a
UD0664 # 05 Y:2003 05 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,536 $2,600 Not Implemented
UD0664 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $6,785 $800 Implemented
UD0664 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,070 $12,830 Implemented
UD0664 # 08 Y:2003 08 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,884 $111 Not Implemented
UD0664 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,630 $5,820 Not Implemented
UD0664 # 10 Y:2003 10 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,280 $378 Not Implemented
UD0664 # 11 Y:2003 11 2003 DISCONNECT BALLASTS $2,820 $250 Implemented
UD0664 # 12 Y:2003 12 2003 INSULATE BARE EQUIPMENT $1,414 $1,800 Not Implemented
UD0664 # 13 Y:2003 13 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,219 $0 Not Implemented
UD0664 # 14 Y:2003 14 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $247 $25 Not Implemented