Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,069
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0290 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,829 | $13,425 | Implemented |
IA0290 # 04 Y:2002 | 04 | 2002 | INSTALL OCCUPANCY SENSORS | $1,312 | $2,128 | Not Implemented |
IA0290 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,198 | $2,970 | Not Implemented |
IA0290 # 06 Y:2002 | 06 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $29,170 | $18,259 | Implemented |
IA0290 # 07 Y:2002 | 07 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $68,750 | $58,676 | Not Implemented |
IC0032 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,691 | $123,310 | Not Implemented |
IC0032 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,926 | $61,950 | Not Implemented |
IC0032 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,212 | $20,124 | Not Implemented |
IC0032 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $39,454 | $19,500 | Implemented |
IC0032 # 05 Y:2002 | 05 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,584 | $19,500 | Not Implemented |
IC0032 # 06 Y:2002 | 06 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $25,500 | $132,960 | Not Implemented |
IC0032 # 07 Y:2002 | 07 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $61,700 | $96,030 | Not Implemented |
IC0032 # 08 Y:2002 | 08 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $25,360 | $8,080 | Not Implemented |
IC0032 # 09 Y:2002 | 09 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $90,684 | $65,000 | Not Implemented |
SF0234 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,185 | $300 | Implemented |
SF0234 # 02 Y:2002 | 02 | 2002 | USE PHOTOCELL CONTROLS | $8,489 | $6,960 | Not Implemented |
SF0234 # 03 Y:2002 | 03 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $988 | $1,250 | Not Implemented |
SF0234 # 04 Y:2002 | 04 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $904 | $1,304 | Not Implemented |
SF0234 # 05 Y:2002 | 05 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,974 | $10,307 | Not Implemented |
SF0234 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,310 | $14,027 | Not Implemented |
SF0234 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,719 | $46,531 | Not Implemented |
SF0234 # 08 Y:2002 | 08 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,441 | $49,000 | Implemented |
LE0131 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,624 | $0 | Implemented |
LE0131 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,376 | $4,500 | Implemented |
LE0131 # 03 Y:2002 | 03 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,486 | $500 | Not Implemented |