IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,069

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0290 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,829 $13,425 Implemented
IA0290 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $1,312 $2,128 Not Implemented
IA0290 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,198 $2,970 Not Implemented
IA0290 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $29,170 $18,259 Implemented
IA0290 # 07 Y:2002 07 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $68,750 $58,676 Not Implemented
IC0032 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,691 $123,310 Not Implemented
IC0032 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,926 $61,950 Not Implemented
IC0032 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,212 $20,124 Not Implemented
IC0032 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39,454 $19,500 Implemented
IC0032 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $15,584 $19,500 Not Implemented
IC0032 # 06 Y:2002 06 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $25,500 $132,960 Not Implemented
IC0032 # 07 Y:2002 07 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $61,700 $96,030 Not Implemented
IC0032 # 08 Y:2002 08 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $25,360 $8,080 Not Implemented
IC0032 # 09 Y:2002 09 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $90,684 $65,000 Not Implemented
SF0234 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,185 $300 Implemented
SF0234 # 02 Y:2002 02 2002 USE PHOTOCELL CONTROLS $8,489 $6,960 Not Implemented
SF0234 # 03 Y:2002 03 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $988 $1,250 Not Implemented
SF0234 # 04 Y:2002 04 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $904 $1,304 Not Implemented
SF0234 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,974 $10,307 Not Implemented
SF0234 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,310 $14,027 Not Implemented
SF0234 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,719 $46,531 Not Implemented
SF0234 # 08 Y:2002 08 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,441 $49,000 Implemented
LE0131 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,624 $0 Implemented
LE0131 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,376 $4,500 Implemented
LE0131 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,486 $500 Not Implemented