IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,069

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0016 # 02 Y:2001 02 2001 ADJUST BURNERS FOR EFFICIENT OPERATION $70,200 $187 Implemented
MI0016 # 03 Y:2001 03 2001 METER WASTE WATER $8,529 $3,650 Not Implemented
MI0016 # 04 Y:2001 04 2001 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $21,440 $10,399 Not Implemented
MI0016 # 05 Y:2001 05 2001 MINIMIZE WATER USAGE $6,397 $1,899 Not Implemented
MI0016 # 06 Y:2001 06 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $97,899 $585,000 Not Implemented
SU0113 # 01 Y:2001 01 2001 REDESIGN PROCESS $89,000 $44,000 Implemented
SU0113 # 02 Y:2001 02 2001 INCREASE USE OF AUTOMATION $76,400 $90,000 Not Implemented
SU0113 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,676 $705 Implemented
SU0113 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $890 $0 Implemented
SU0113 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $0 Implemented
SU0113 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $319 $115 Implemented
SU0113 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $174 $60 Implemented
UM0189 # 01 Y:2001 01 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,060 $1,400 Not Implemented
UM0189 # 02 Y:2001 02 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,362 $1,500 Not Implemented
UM0189 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $750 Not Implemented
UM0189 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,845 $1,284 Not Implemented
UM0189 # 05 Y:2001 05 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,900 $8,250 Not Implemented
UM0189 # 06 Y:2001 06 2001 RECOVER AND REUSE COOLING WATER $12,000 $4,400 Not Implemented
UM0189 # 07 Y:2001 07 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,250 $1,950 Not Implemented
UU0002 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,263 $700 Implemented
UU0002 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,384 $950 Not Implemented
UU0002 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,066 $1,066 Not Implemented
UU0002 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $254 $1,097 Implemented
UU0002 # 05 Y:2001 05 2001 PAY BILLS ON TIME TO AVOID LATE FEES $1,040 $0 Implemented
SD0280 # 01 Y:2001 01 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $38,808 $51,000 Not Implemented