IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,069

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0169 # 07 Y:2000 07 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,084 $350 Not Implemented
UM0169 # 08 Y:2000 08 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $50,433 $23,500 Implemented
UM0169 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $312,500 $860,000 Not Implemented
UM0168 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $526 $993 Implemented
UM0168 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,117 $50,000 Not Implemented
UM0168 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,945 $2,250 Implemented
UM0168 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $8,180 $300 Implemented
UM0168 # 05 Y:2000 05 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,403 $1,400 Not Implemented
UM0168 # 06 Y:2000 06 2000 RECOVER WASTE HEAT FROM EQUIPMENT $293,452 $1,020,000 Not Implemented
WV0194 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,827 $1,400 Not Implemented
WV0194 # 02 Y:2000 02 2000 USE RADIANT HEATER FOR SPOT HEATING $25,513 $23,400 Not Implemented
WV0194 # 03 Y:2000 03 2000 USE OPTIMUM TEMPERATURE $60,864 $75,000 Not Implemented
WV0194 # 04 Y:2000 04 2000 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,330 $210 Implemented
WV0194 # 05 Y:2000 05 2000 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,224 $460 Implemented
WV0194 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $318 $500 Not Implemented
WV0194 # 07 Y:2000 07 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,231 $1,280 Implemented
WV0194 # 08 Y:2000 08 2000 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,605 $5,330 Implemented
WV0194 # 09 Y:2000 09 2000 RECYCLE CASTING SAND $238,316 $160,000 Not Implemented
WV0194 # 10 Y:2000 10 2000 AUTOMATE FINISHING PROCESS $271,680 $200,000 Not Implemented
WV0194 # 11 Y:2000 11 2000 CLEAR AND RENT EXISTING SPACE $22,500 $500 Not Implemented
WV0194 # 12 Y:2000 12 2000 IMPROVE SPACE COMFORT CONDITIONING $15,000 $5,824 Implemented
ND0346 # 01 Y:2000 01 2000 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $24,189 $150,000 Not Implemented
ND0346 # 02 Y:2000 02 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,277 $20,000 Not Implemented
ND0346 # 03 Y:2000 03 2000 DEVELOP A REPAIR/REPLACE POLICY $1,357 $20,552 Not Implemented
ND0346 # 04 Y:2000 04 2000 CHECK FOR ACCURACY OF UTILITY / POWER METERS $25,612 $500 Implemented