IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,069

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0227 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $825,660 $1,863 n/a
IA0227 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $66,200 $2,000 n/a
IA0227 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $25,100 $150 n/a
IA0227 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $72,026 $0 n/a
IA0227 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,875 $0 n/a
IA0227 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,254 $2,113 n/a
IA0227 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $5,561 $1,330 n/a
IA0227 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $6,074 $3,038 n/a
IA0227 # 09 Y:1999 09 1999 MAINTAIN MACHINES TO REDUCE LEAKS $5,867 $3,906 n/a
IA0227 # 10 Y:1999 10 1999 MAINTAIN MACHINES TO REDUCE LEAKS $2,951 $213 n/a
IA0227 # 11 Y:1999 11 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $150,880 $166,000 n/a
IA0227 # 12 Y:1999 12 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $150,880 $133,000 n/a
IA0227 # 13 Y:1999 13 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $150,880 $136,000 n/a
IA0227 # 14 Y:1999 14 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $150,880 $154,000 n/a
IA0227 # 15 Y:1999 15 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $75,440 $146,000 n/a
IA0227 # 16 Y:1999 16 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $75,440 $150,000 n/a
ND0328 # 01 Y:1999 01 1999 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $12,717 $27,395 Implemented
ND0328 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $8,575 $1,100 Not Implemented
ND0328 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,212 $7,590 Implemented
ND0328 # 04 Y:1999 04 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $912 $950 Implemented
ND0328 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $892 $200 Not Implemented
ND0328 # 06 Y:1999 06 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $748 $250 Implemented
ND0328 # 07 Y:1999 07 1999 USE OPTIMUM THICKNESS INSULATION $489 $1,068 Not Implemented
ND0328 # 08 Y:1999 08 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $285 $0 Implemented
ND0328 # 09 Y:1999 09 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $293 $350 Not Implemented