IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,069

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0356 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $77,392 $162,000 Not Implemented
WI0356 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,279 $58,100 Not Implemented
WI0356 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,328 $3,182 Not Implemented
WI0356 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,610 $3,150 Not Implemented
WI0356 # 05 Y:1999 05 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $223 $666 Not Implemented
WI0356 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,408 $640 Implemented
WI0356 # 07 Y:1999 07 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,364 $0 Not Implemented
WI0356 # 08 Y:1999 08 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,469 $500 Not Implemented
WI0356 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,205 $3,856 Implemented
WI0356 # 10 Y:1999 10 1999 PAY BILLS ON TIME TO AVOID LATE FEES $105 $0 Implemented
UD0571 # 01 Y:1999 01 1999 RECYCLE CASTING SAND $227,844 $135,000 Implemented
UD0571 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $67,000 $24,000 Not Implemented
UD0571 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $27,700 $40,000 Not Implemented
UD0571 # 04 Y:1999 04 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,000 $64,000 Implemented
UD0571 # 05 Y:1999 05 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $18,667 $0 Not Implemented
UD0571 # 06 Y:1999 06 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,800 $0 Not Implemented
UD0571 # 07 Y:1999 07 1999 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $9,000 $24,000 Not Implemented
UD0571 # 08 Y:1999 08 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,582 $0 Implemented
UD0571 # 09 Y:1999 09 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,489 $0 Not Implemented
WV0162 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $107,972 $39,000 Not Implemented
WV0162 # 02 Y:1999 02 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $6,113 $4,000 Not Implemented
WV0162 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $317 $20 Implemented
WV0162 # 04 Y:1999 04 1999 PAY UTILITY BILLS ON TIME $2,895 $0 Not Implemented
WV0162 # 05 Y:1999 05 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,295 $1,350 Not Implemented
WV0162 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,920 $109 Implemented