IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,069

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0195 # 04 Y:1998 04 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,783 $500 Implemented
IA0195 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,336 $130 Implemented
IA0195 # 06 Y:1998 06 1998 RECOVER MECHANICAL ENERGY $2,321 $3,413 Implemented
IA0195 # 07 Y:1998 07 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $940 $500 Implemented
IA0195 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $844 $3,478 Not Implemented
IA0195 # 09 Y:1998 09 1998 INSTALL OCCUPANCY SENSORS $800 $899 Not Implemented
HO0174 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,898 $20,287 Implemented
HO0174 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $875 $2,308 Not Implemented
HO0174 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,918 $1,500 Implemented
HO0174 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $4,561 $7,680 Not Implemented
HO0174 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $7,800 $8,000 Not Implemented
HO0174 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $24,960 $5,000 Not Implemented
HO0174 # 07 Y:1998 07 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,800 $0 Not Implemented
HO0174 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,300 $0 Implemented
MA0404 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $412,115 $1,000,000 Implemented
MA0404 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,416 $16,505 Not Implemented
MA0404 # 03 Y:1997 03 1997 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $12,933 $71,400 Implemented
MA0404 # 04 Y:1997 04 1997 USE OTHER METHODS FOR NEUTRALIZATION $34,200 $0 Not Implemented
MA0404 # 05 Y:1997 05 1997 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $0 $0 Implemented
AS0212 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,076 $13,917 Not Implemented
AS0212 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $1,611 $2,475 Not Implemented
AS0212 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,975 $24,800 Implemented
AS0212 # 04 Y:1997 04 1997 USE SYNTHETIC LUBRICANT $878 $800 Implemented
AS0212 # 05 Y:1997 05 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,536 $4,800 Implemented
AS0212 # 06 Y:1997 06 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,877 $0 Implemented