IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,069

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0469 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $1,531 $850 Not Implemented
KU0469 # 07 Y:1996 07 1996 ADJUST BURNERS FOR EFFICIENT OPERATION $1,026 $1,000 Implemented
KU0469 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $515 $660 Implemented
MS0069 # 01 Y:1996 01 1996 USE SYNTHETIC LUBRICANT $1,743 $300 Not Implemented
MS0069 # 02 Y:1996 02 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,677 $2,740 Not Implemented
MS0069 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,360 $7,226 Not Implemented
MS0069 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,012 $925 Not Implemented
MS0069 # 05 Y:1996 05 1996 USE POWER DURING OFF-PEAK PERIODS $81,053 $0 Not Implemented
MS0069 # 06 Y:1996 06 1996 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,080 $640 Not Implemented
IA0151 # 01 Y:1996 01 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $16,807 $5,000 Not Implemented
IA0151 # 02 Y:1996 02 1996 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,571 $25,000 Implemented
IA0151 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,787 $335 Implemented
IA0151 # 04 Y:1996 04 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $476 $0 Implemented
IA0151 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $377 $1,434 Implemented
IA0151 # 06 Y:1996 06 1996 RECYCLE CASTING SAND $227 $26 Not Implemented
KG0064 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,652 $12,200 Implemented
KG0064 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,970 $3,560 Not Implemented
KG0064 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $846 $343 Implemented
KG0064 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $481 $20 Not Implemented
KG0064 # 05 Y:1996 05 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $1,283 $651 Not Implemented
DS0048 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $1,037 $1,900 Implemented
DS0048 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,486 $18,021 Implemented
DS0048 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,919 $18,845 Implemented
DS0048 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,971 $750 Not Implemented
DS0048 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,128 $250 Implemented