Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0280 # 10 Y:2009 | 10 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $644 | $1,009 | Not Implemented |
SU0280 # 09 Y:2009 | 09 | 2009 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $47,225 | $73,508 | Not Implemented |
SU0280 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $344 | $405 | Not Implemented |
SU0280 # 07 Y:2009 | 07 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,497 | $3,768 | Implemented |
SU0280 # 06 Y:2009 | 06 | 2009 | INSTALL OCCUPANCY SENSORS | $4,873 | $1,477 | Implemented |
SU0280 # 11 Y:2009 | 11 | 2009 | OPTIMIZE PLANT POWER FACTOR | $2,725 | $7,949 | Implemented |
SU0280 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,497 | $378 | Implemented |
SU0280 # 04 Y:2009 | 04 | 2009 | USE SYNTHETIC LUBRICANT | $1,438 | $0 | Not Implemented |
SU0280 # 03 Y:2009 | 03 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,445 | $0 | Implemented |
SU0280 # 02 Y:2009 | 02 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,999 | $0 | Implemented |
SU0280 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,297 | $0 | Implemented |
SU0183 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $483 | $523 | Implemented |
SU0183 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,121 | $25,260 | Not Implemented |
SU0183 # 08 Y:2004 | 08 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $11,288 | $16,817 | Implemented |
SU0183 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,502 | $12,517 | Not Implemented |
SU0183 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,191 | $680 | Implemented |
SU0183 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,663 | $502 | Not Implemented |
SU0183 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $331 | $0 | Implemented |
SU0183 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,014 | $0 | Not Implemented |
SU0183 # 01 Y:2004 | 01 | 2004 | ADVERTISE PRODUCT OR SERVICE | $83,900 | $0 | Implemented |
SU0113 # 01 Y:2001 | 01 | 2001 | REDESIGN PROCESS | $89,000 | $44,000 | Implemented |
SU0113 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $319 | $115 | Implemented |
SU0113 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $0 | Implemented |
SU0113 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $890 | $0 | Implemented |
SU0113 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,676 | $705 | Implemented |