Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
115
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0408 # 01 Y:2001 | 01 | 2001 | MODIFY WORKLOAD | $33,405 | $30,000 | n/a |
WI0408 # 08 Y:2001 | 08 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,476 | $6,957 | n/a |
WI0408 # 06 Y:2001 | 06 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,596 | $12,000 | n/a |
WI0408 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,442 | $6,917 | n/a |
WI0408 # 04 Y:2001 | 04 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $20,025 | $0 | n/a |
WI0408 # 03 Y:2001 | 03 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $23,329 | $31,000 | n/a |
WI0408 # 07 Y:2001 | 07 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,941 | $11,250 | n/a |
WI0408 # 02 Y:2001 | 02 | 2001 | MINIMIZE WATER USAGE | $29,411 | $2,200 | n/a |
OK0630 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,542 | $1,800 | Not Implemented |
OK0630 # 06 Y:2001 | 06 | 2001 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $115,000 | $180,000 | Not Implemented |
OK0630 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,400 | $0 | Not Implemented |
OK0630 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,953 | $300 | Implemented |
OK0630 # 04 Y:2001 | 04 | 2001 | INSTALL SET-BACK TIMERS | $11,800 | $3,370 | Implemented |
OK0630 # 03 Y:2001 | 03 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,994 | $3,700 | Implemented |
OK0630 # 05 Y:2001 | 05 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $28,600 | $5,000 | Not Implemented |
MS0191 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,525 | $1,000 | Implemented |
MS0191 # 07 Y:2001 | 07 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $448 | $302 | Not Implemented |
MS0191 # 08 Y:2001 | 08 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,135 | $2,916 | Not Implemented |
MS0191 # 03 Y:2001 | 03 | 2001 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $67,125 | $17,280 | Not Implemented |
MS0191 # 01 Y:2001 | 01 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $35,695 | $1,000 | Implemented |
MS0191 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,218 | $367 | Not Implemented |
MS0191 # 05 Y:2001 | 05 | 2001 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $5,216 | $7,600 | Not Implemented |
MS0191 # 04 Y:2001 | 04 | 2001 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $14,314 | $5,040 | Not Implemented |
IA0282 # 09 Y:2001 | 09 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $45,760 | $58,400 | n/a |
IA0282 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,739 | $290 | Not Implemented |