Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0408 # 01 Y:2001 01 2001 MODIFY WORKLOAD $33,405 $30,000 n/a
WI0408 # 08 Y:2001 08 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,476 $6,957 n/a
WI0408 # 06 Y:2001 06 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,596 $12,000 n/a
WI0408 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,442 $6,917 n/a
WI0408 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,025 $0 n/a
WI0408 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $23,329 $31,000 n/a
WI0408 # 07 Y:2001 07 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,941 $11,250 n/a
WI0408 # 02 Y:2001 02 2001 MINIMIZE WATER USAGE $29,411 $2,200 n/a
OK0630 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,542 $1,800 Not Implemented
OK0630 # 06 Y:2001 06 2001 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $115,000 $180,000 Not Implemented
OK0630 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,400 $0 Not Implemented
OK0630 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,953 $300 Implemented
OK0630 # 04 Y:2001 04 2001 INSTALL SET-BACK TIMERS $11,800 $3,370 Implemented
OK0630 # 03 Y:2001 03 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,994 $3,700 Implemented
OK0630 # 05 Y:2001 05 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $28,600 $5,000 Not Implemented
MS0191 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,525 $1,000 Implemented
MS0191 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $448 $302 Not Implemented
MS0191 # 08 Y:2001 08 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,135 $2,916 Not Implemented
MS0191 # 03 Y:2001 03 2001 PREHEAT COMBUSTION AIR WITH WASTE HEAT $67,125 $17,280 Not Implemented
MS0191 # 01 Y:2001 01 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $35,695 $1,000 Implemented
MS0191 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,218 $367 Not Implemented
MS0191 # 05 Y:2001 05 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $5,216 $7,600 Not Implemented
MS0191 # 04 Y:2001 04 2001 PREHEAT COMBUSTION AIR WITH WASTE HEAT $14,314 $5,040 Not Implemented
IA0282 # 09 Y:2001 09 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $45,760 $58,400 n/a
IA0282 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,739 $290 Not Implemented