IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3321 Gray And Ductile Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0224 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $305 $700 Not Implemented
MZ0224 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $355 $300 Not Implemented
MZ0224 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $474 $663 Implemented
MZ0224 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,705 $1,263 Implemented
MZ0224 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,978 $2,200 Implemented
MZ0046 # 09 Y:2009 09 2009 UPGRADE CONTROLS ON COMPRESSORS $10,100 $8,000 Implemented
MZ0046 # 08 Y:2009 08 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,483 $0 Implemented
MZ0046 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $205,683 $30,000 Not Implemented
MZ0046 # 06 Y:2009 06 2009 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $8,620 $1,800 Implemented
MZ0046 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,771 $0 Implemented
MZ0046 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,749 $1,300 Implemented
MZ0046 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $18,406 $1,380 Implemented
MZ0046 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,025 $14,100 Implemented
MZ0046 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,631 $54,630 Implemented
MO0070 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,044 $1,000 Not Implemented
MO0070 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,709 $18,500 Not Implemented
MO0070 # 06 Y:1992 06 1992 RECOVER AND REUSE COOLING WATER $8,112 $0 Not Implemented
MO0070 # 05 Y:1992 05 1992 IMPROVE LUBRICATION PRACTICES $11,792 $0 Not Implemented
MO0070 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,418 $265 Not Implemented
MO0070 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,537 $109,000 Not Implemented
MO0070 # 02 Y:1992 02 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $35,376 $200 Not Implemented
MO0070 # 01 Y:1992 01 1992 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $64,793 $300 Not Implemented
KU0325 # 01 Y:1990 01 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,128 $20,800 Not Implemented
KU0325 # 07 Y:1990 07 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $50,733 $0 Implemented
KU0325 # 06 Y:1990 06 1990 REDUCE VENTILATION AIR $8,297 $11,700 Implemented